Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
| 03/04/2019 |
FCON – OH Piping & Hydro |
JPEELDAVIS |
Approved |
Entered by JPEELDA1 - 207 & 209 PSI on the gauges. The west building design has completely been altered since the plans that we approved were issued with a permit. Need to have ASBUILT drawings prior to final. Some of the pipe is right on the heat registers need to move away. Three-Four heads were covered in foam and need to be replaced. |