Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2018 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | ||
| 10/09/2018 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | 1. UG/Piping Hydro for 8" Fire Line Approved. 2. Still need to inspect and Hydro 6" FDC UG Line. 3. Will most likely loop both lines for flush and flush through 6" remote FDC. |