Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - FCON - Pump - Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2018 |
COT - FCON - Pump - Final |
JPEELDAVIS |
Approved |
Entered by JPEELDA1 - |
| 10/02/2018 |
COT - FCON - Pump - Final |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - Need to re-wire the electric to the pump
Pump suction was at 20psi but the curve passed
Need to connect to the fire alarm system
Need to re-test the fire pump once complete
Test broke the double back flow preventer so that will need to be tested
Need to open the closed street control valve |