Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
Permit Number - T18FC00080
Inspection Description - FIRE - ALARM FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/24/2019 | FIRE - ALARM FINAL | Approved | Already tested by JPD. Verified missing items were done. | |
12/20/2018 | FIRE - ALARM FINAL | Partial Approval | Tested all of the waterflow and tampers. Verified the 4 floors notification devices. Monitoring verified. Need to check the following for COFO: Room 404,402,304,307,211,206,204,201 and 202 need to replace the strobe/low frequency sounders with LF only sounders. The first floor now has the ADA rooms. Need to add the circuit disconnecting means to all the fire panels and boosters. Label the batteries with the installation date. Need to add the red lock out that reads FIRE ALARM CIRCUIT for all breakers. Submit ASBUILT fire alarm drawings and elevator records from the state elevator inspector showing that that portion passed. |
|
11/15/2018 | FIRE - ALARM FINAL | Partial Approval | 2018.11.15 1. TCO a. Phasing plan - 1st floor first and then turn-key remainder b. No egress or life safety issues outstanding Sprinkler complete (all aspects, incl. labeling, signage, monitoring) c. Establish the completion of the fire safety system overall Unfinished floors - egress paths only d. All Exit signs, emergency lighting, stair marking throughout e. Exterior accessibility and egress f. Street side parking for each of the occupied units i. Construction access - Three stairwells 2. CofO a. All development package items 2-3 weeks b. Final authorization to discharge in 2 weeks |