Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/01/2019 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
ON SITE AT TRAILER PARK. THE WALL HAS BEEN REPAIRED. VIOLATION ABATED |
| 01/22/2019 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
WENT TO PDSD AND FOUND OUT THAT A SOLID WALL CANNOT REPLACE THE GATE. THERE IS A MAN WHOLE AND STORM DRAIN AT THAT SITE. |
| 01/17/2019 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
PERSON COMPLETING THE MASONRY HAS GONE BEYOND EXPECTATIONS COMPLETING 4 SECTIONS OF 10 FT BLOCK WALL MASONRY, HAS REPLACED TOP ROWS OF LOOSE BLOCK A D ADDED A CAP BLOCK. THE SOUTH CHAINLINK FENCE HAS BEEN FIXED AND STOOD UP AND 3 FT GAP BETWEEN WALL AND GATE WAS ENCLOSED. DAN IS TO COMPLETE REPAIRS TO THE GATE IN THE MIDDLE OF THE VERY LONG FENCE BLOCK WALL AND MAY BE COMPLETED ON 1/21/2019 |
| 01/07/2019 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
ON SITE WITH INSPECTOR GG. WORK HAS BEEN STARTED AT THE SOUTH END OF THE WALL. THE EASEMENT ON THE EAST OF PROPERTY IS CLEAN. |
| 01/16/2018 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
ON SITE WITH GG, SPOKE TO DAN. PROGRESS HAS BEEN MADE TO THE WALL. HE STATED SHOULD BE DONE BY 01/21/19 |