Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date |
Description |
Inspector |
Results |
Comments |
| 10/17/2018 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
ONSITE INSPECTION: THE BUILDING HAS NEW WATER LINES (PEX) AND NEW DRAIN WASTE PIPING (ABS) INSTALL IN BOTH RESTROOMS, ABS AND PEX ARE COVERED IN CONCRETE, ANOTHER COMPARTMENT IN THE REAR OF THE BUILDING ALSO HAS NEW PEX LINES AND ABS ALSO INSTALLED. BOTH RESTROOMS HAVE NEW STEEL WALL FRAMING WITH ELECTRICAL RACEWAYS. THERE ARE ROLLS OF PEX AND OTHER MATERIAL SUCH AS DRYWALL INSIDE THE BUILDING. THERE IS A NEW FAN ASSEMBLE INSTALLED IN THE REAR RESTROOM. A STOP WORK ORDER WAS ISSUED, PER BUILDING OFFICIAL, THE ELECTRICAL WORK MAY CONTINUE. |