Case: T18DV06716
Case Details
Entered Date:
10/17/2018
Applicant:
JOSEPH C LIEBERZ
Description:
WOP - MECHANICAL & PLUMBING&BUILDIG
Completed Inspections
Case Status: COMPLIAN
Case Number: T18DV06716
Case Description: WORK WITHOUT PERMITS-COMMERCL
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2018 | INSP - INITIAL CODE ENFORCMENT | VALDEZ | Approved | ONSITE INSPECTION: THE BUILDING HAS NEW WATER LINES (PEX) AND NEW DRAIN WASTE PIPING (ABS) INSTALL IN BOTH RESTROOMS, ABS AND PEX ARE COVERED IN CONCRETE, ANOTHER COMPARTMENT IN THE REAR OF THE BUILDING ALSO HAS NEW PEX LINES AND ABS ALSO INSTALLED. BOTH RESTROOMS HAVE NEW STEEL WALL FRAMING WITH ELECTRICAL RACEWAYS. THERE ARE ROLLS OF PEX AND OTHER MATERIAL SUCH AS DRYWALL INSIDE THE BUILDING. THERE IS A NEW FAN ASSEMBLE INSTALLED IN THE REAR RESTROOM. A STOP WORK ORDER WAS ISSUED, PER BUILDING OFFICIAL, THE ELECTRICAL WORK MAY CONTINUE. |
| 12/26/2018 | INSP - FOLLOW UP CODE ENFORCE | VALDEZ | Approved | ARCHITECT WORKING ON PLANS CHECK IN 30 DAYS |
Completed Activity Special Conditions
Case Description - WORK WITHOUT PERMITS-COMMERCL
Case Number - T18DV06716
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
| Date | Name |
| 10/17/2018 | CONTACTED BY PHONE |
| 10/17/2018 | CONTACTED IN PERSON |
| 10/17/2018 | CONTACTED BY EMAIL |
| 10/17/2018 | STOP WORK ORDER ISSUED |