Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date |
Description |
Inspector |
Results |
Comments |
| 08/27/2018 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
Arrived on site and met with assistant manager. States they have been dealing with leaks since over the weekend. However had sleeves on the break up until today when they were going to go ahead and replace the damage line. Water was shut down for approximately 45 minutes well the new line was put in. Maintenance workers were in the office the same time I was there and also explain the same thing. At this point water has been restored and again only down approximately 45 minutes today. Will follow up |