Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2019 | ENGINEERING - FINAL | Approved | ||
| 07/12/2019 | ENGINEERING - FINAL | Not ready for Inspection | Inspections and result will be entered by Ron LeDonne. | |
| 07/12/2019 | ENGINEERING - FINAL | Partial Approval | COMPLET ALL WORK ON AP PLANS FOR OUT SIDE BUILDING. OK FOR STOCKING TCO ONLY. | |
| 06/26/2019 | ENGINEERING - FINAL | Continued | Met with GC on the job site went over accessible parking. route to Building.Plans are limited on details. Suggested to GC to Request for information from architect for slopes and dimensions. | |
| 06/11/2019 | ENGINEERING - FINAL | Not ready for Inspection | Went over ADA parking spaces with GC on site. | |
| 03/04/2019 | ENGINEERING - FINAL | Prior to Final Inspectn | T18CM09810 1) Conditional approval for this substantial interior improvement only. A hold on Engineering final inspection will remain in place until it is confirmed through FEMA that the structure conforms to floodplain regulations through an elevation certificate. If FEMA finds that the structure is non-conforming then the building will require a Commercial floodproofing certificate in accordance with applicable standards. https://www.fema.gov/media-library/assets/documents/34270 |