Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - RECONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2019 | ELECTRIC - RECONNECT | Not ready for Inspection | No access locked. called contact on permit No Answer |
|
| 01/17/2019 | ELECTRIC - RECONNECT | Approved | TEP RECN | |
| 11/30/2018 | ELECTRIC - RECONNECT | Correction Required | 1-Label services. 2-Install weatherproof conduit connectors above bussing. 3-Seal unused openings. 4-Install antioxidant on aluminum conductors. 5-Multiple neutrals on the same lug. 6- Provide access to North service; paint has rendered it inoperable. 7-Conduit on South Service will not allow installation of dead front. |
|
| 11/29/2018 | ELECTRIC - RECONNECT | Not ready for Inspection | Locked, no access, no one on premises | |
| 11/28/2018 | ELECTRIC - RECONNECT | Cancelled | IVRS - RI canceled | |
| 11/28/2018 | ELECTRIC - RECONNECT | Not ready for Inspection | squatters sleeping in commercial building |