Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2019 | BUILDING - FINAL | Approved | ||
| 10/17/2019 | BUILDING - FINAL | Partial Approval | 1- Recommended for C. of O. pending Engineering approval | |
| 10/16/2019 | BUILDING - FINAL | Denied | 1- Shall provide Accessible signage at restrooms. 2- Shall locate the Toilet paper dispenser 7 to 9 inches from the front of the water closet. 3- Shall locate the soap dispenser 48 inches a.f.f. |
|
| 10/15/2019 | BUILDING - FINAL | Not ready for Inspection | 1- Work is incomplete |