Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2019 | PLUMBING - ABOVE CEILING | Approved | ||
| 03/08/2019 | PLUMBING - ABOVE CEILING | Denied | pex must be 12 inches from all light fixtures,FHE plates required on top plate, nail plates required. |