Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T18CM08138

Parcel: 132130680

Inspection Status: Approved

Inspection History: ELECTRIC - ABOVE CEILING

Permit Number - T18CM08138

Inspection Description - ELECTRIC - ABOVE CEILING

Inspection Status - Approved

Date Description Inspector Results Comments
07/18/2019 ELECTRIC - ABOVE CEILING Approved
06/21/2019 ELECTRIC - ABOVE CEILING Not ready for Inspection North east quadrant third-floor, unable to access area, east stairwell blocked off at second level and North stairwell blocked off at third level. OK to proceed with border tiles and some in the center area just leave enough out that I can still see into the ceiling.
06/20/2019 ELECTRIC - ABOVE CEILING Not ready for Inspection seismic wiring not completed, lights not completed for north east quadrant third-floor.
06/18/2019 ELECTRIC - ABOVE CEILING Partial Approval third floor center lobby OK to cover
06/12/2019 ELECTRIC - ABOVE CEILING Partial Approval 3rd floor West.
06/10/2019 ELECTRIC - ABOVE CEILING Partial Approval Above 3rd floor center stairway
06/07/2019 ELECTRIC - ABOVE CEILING Partial Approval OK to cover first floor lobby west side only if work needs to get completed this weekend, otherwise would prefer to see it Monday 100% complete. Before covering finish work on lights, still being installed at time of inspection. Seismic wiring needs to be completed mainly on the far west end. Make sure mechanical branches are to there openings. One branch arm is not reaching it’s opening. Make sure mechanical dampers are accessible.
06/06/2019 ELECTRIC - ABOVE CEILING Partial Approval men’s center third-floor restroom ok.
06/04/2019 ELECTRIC - ABOVE CEILING Partial Approval third floor south east quadrant and women’s center restroom ok to cover, complete work in open junction boxes.
05/23/2019 ELECTRIC - ABOVE CEILING Partial Approval Second floor north east quadrant still needs several lights secured with either the tabs or seismic. Still open junction boxes, still open whips coming out of ceiling, acoustical ceiling not completely secured in several spots. Third floor not ready yet.
05/08/2019 ELECTRIC - ABOVE CEILING Partial Approval complete making up junction boxes south east open area first floor.
04/15/2019 ELECTRIC - ABOVE CEILING Partial Approval 2nd fl bath men’s and women’s, aka n-slab. Wall and ceiling.
S/W baths, 2nd for, Wall and ceiling.
3rd fl south bath, fl and ceiling