Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
Permit Number - T18CM08138
Inspection Description - ELECTRIC - ABOVE CEILING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2019 | ELECTRIC - ABOVE CEILING | Approved | ||
06/21/2019 | ELECTRIC - ABOVE CEILING | Not ready for Inspection | North east quadrant third-floor, unable to access area, east stairwell blocked off at second level and North stairwell blocked off at third level. OK to proceed with border tiles and some in the center area just leave enough out that I can still see into the ceiling. | |
06/20/2019 | ELECTRIC - ABOVE CEILING | Not ready for Inspection | seismic wiring not completed, lights not completed for north east quadrant third-floor. | |
06/18/2019 | ELECTRIC - ABOVE CEILING | Partial Approval | third floor center lobby OK to cover | |
06/12/2019 | ELECTRIC - ABOVE CEILING | Partial Approval | 3rd floor West. | |
06/10/2019 | ELECTRIC - ABOVE CEILING | Partial Approval | Above 3rd floor center stairway | |
06/07/2019 | ELECTRIC - ABOVE CEILING | Partial Approval | OK to cover first floor lobby west side only if work needs to get completed this weekend, otherwise would prefer to see it Monday 100% complete. Before covering finish work on lights, still being installed at time of inspection. Seismic wiring needs to be completed mainly on the far west end. Make sure mechanical branches are to there openings. One branch arm is not reaching it’s opening. Make sure mechanical dampers are accessible. | |
06/06/2019 | ELECTRIC - ABOVE CEILING | Partial Approval | men’s center third-floor restroom ok. | |
06/04/2019 | ELECTRIC - ABOVE CEILING | Partial Approval | third floor south east quadrant and women’s center restroom ok to cover, complete work in open junction boxes. | |
05/23/2019 | ELECTRIC - ABOVE CEILING | Partial Approval | Second floor north east quadrant still needs several lights secured with either the tabs or seismic. Still open junction boxes, still open whips coming out of ceiling, acoustical ceiling not completely secured in several spots. Third floor not ready yet. | |
05/08/2019 | ELECTRIC - ABOVE CEILING | Partial Approval | complete making up junction boxes south east open area first floor. | |
04/15/2019 | ELECTRIC - ABOVE CEILING | Partial Approval | 2nd fl bath men’s and women’s, aka n-slab. Wall and ceiling. S/W baths, 2nd for, Wall and ceiling. 3rd fl south bath, fl and ceiling |