Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2018 | PLUMBING - ROUGH, SOIL | Approved | ||
| 10/10/2018 | PLUMBING - ROUGH, SOIL | Denied | 1- Shall provide a seprate waste line and vent for master bath shower and a separate vent for the water closet. 2- Re test the DWV system. |
|
| 10/09/2018 | PLUMBING - ROUGH, SOIL | Denied | The outlet of the vents for both water closets shall be located above the center line of the soil line. |