Inspection Status: Passed
Inspection History: COT - LCBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 08/11/2020 |
COT - LCBU - Building Progress |
DMUNIZ |
Approved |
Entered by JSCHNEI2 - Approved |
| 02/04/2019 |
COT - LCBU - Building Progress |
BJONES |
Partial Approval |
Entered by CBELL1 - Hold downs bolts per spec
Footings 6-#8 top and bottom #6 8” OC South 6 #8 T&B #4 8”OC to Slab
Slab E&W #4 8”OC
1/2” grounding electrode conductors per plan
Conduits in 7 locations per plan
Installation per sheet SGMP-S0300.DGC |