Inspection Status: Passed
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 04/01/2022 |
COT - LCBU - Excavation/Rebar/Zoning |
DROBERTS |
Approved |
Entered by DROBERT5 - PREVIOUSLY APPROVED ON 01/02/2019 |
| 02/05/2019 |
COT - LCBU - Excavation/Rebar/Zoning |
BJones |
Partial Approval |
Entered by BJONES1 - 4'X6'Footing, Hold Down Base with bolts, Conduits, 1/2"Braided Copper Grounding Electrode Conductors 7 locations Cad Welded West 2 Matts 6 #8 Top and Bottom, with #6 at 8" OC South 6 #8 Top and Bottom. #4 to Slab Work per Sheet SGMP-S 0300. DGN |
| 01/22/2019 |
COT - LCBU - Excavation/Rebar/Zoning |
bjones |
Partial Approval |
Entered by BJONES1 - Rebar, Ufer with Cad Welding to steel, and Conduit per plan |
| 01/02/2019 |
COT - LCBU - Excavation/Rebar/Zoning |
BJONES |
Approved |
Entered by CBELL1 - #8 Rebar EW with #6 Rebar EW per page SGP-S-0305
Ufer Grounding Electrodes Conductors
1/2" stranded copper Cad Welded to Rebar
16-6" and 20 11/4" PVC Conduits per plan |