Permit: T18CM06339

Parcel: Unknown

Inspection Status: Passed

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
04/01/2022 COT - LCBU - Excavation/Rebar/Zoning  DROBERTS Approved Entered by DROBERT5 - PREVIOUSLY APPROVED ON 01/02/2019
02/05/2019 COT - LCBU - Excavation/Rebar/Zoning  BJones Partial Approval Entered by BJONES1 - 4'X6'Footing, Hold Down Base with bolts, Conduits, 1/2"Braided Copper Grounding Electrode Conductors 7 locations Cad Welded West 2 Matts 6 #8 Top and Bottom, with #6 at 8" OC South 6 #8 Top and Bottom. #4 to Slab Work per Sheet SGMP-S 0300. DGN
01/22/2019 COT - LCBU - Excavation/Rebar/Zoning  bjones Partial Approval Entered by BJONES1 - Rebar, Ufer with Cad Welding to steel, and Conduit per plan
01/02/2019 COT - LCBU - Excavation/Rebar/Zoning  BJONES Approved Entered by CBELL1 - #8 Rebar EW with #6 Rebar EW per page SGP-S-0305 Ufer Grounding Electrodes Conductors 1/2" stranded copper Cad Welded to Rebar 16-6" and 20 11/4" PVC Conduits per plan