Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2024 | COT - HCBU - Preslab | Not Ready | 2/6/24: Preslab not ready | |
| 02/12/2024 | COT - HCBU - Preslab | Re-inspection required | 2/6/24: Preslab not ready 2/12/24: Called Carlos once arrived on site for access code and did not get an answer. Gate is locked no access to site. 2/12/24: detail 3/S1 calls out for dowels every 48" O.C with 8" embedment into new footings and existing footing, missing throughout, rebar supports are creating voids as reinforcements (large debris supporting rebar), footing F4 requires 24"x24" by 18" height. |
|
| 02/13/2024 | COT - HCBU - Preslab | Partial Pass | 2/6/24: Preslab not ready 2/12/24: Called Carlos once arrived on site for access code and did not get an answer. Gate is locked no access to site. 2/12/24: detail 3/S1 calls out for dowels every 48" O.C with 8" embedment into new footings and existing footing, missing throughout, rebar supports are creating voids as reinforcements (large debris supporting rebar), footing F4 requires 24"x24" by 18" height. 2/13/24: reinforcement per plan in rooms 104,105,106,107,108,109 ok to pour in progress areas. Partial pass |
|
| 03/15/2024 | COT - HCBU - Preslab | Passed |