Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2019 | PLUMBING - INTERMEDIATE | Approved | ||
| 02/06/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | 1- Work is incomplete | |
| 02/05/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Shall install 2nd floor sanitary waste and soil lines per chapter 9 2012 IPC. All waste and soil shall connect horizontal to the horizontal trunk line, no offsets allowed. 2- Shall provide blocking under 2 inch horizontal waste lines. |