Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - UFER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2019 | ELECTRIC - UFER | Approved | ||
| 10/24/2018 | ELECTRIC - UFER | Denied | Need 20' of rebar in bottom third of footing. Not 17' with 3' bent verticle. Add appropriate length and attach to existing with 3 tie wires |