Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2018 | REINFORCED MASONRY PRE-GROUT | Approved | ||
| 12/12/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Lines D to line F on column three, third lift | |
| 12/11/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | D5 to D4 Top out. F1 to F3 top out. D to F column 3 2nd lift. | |
| 12/07/2018 | REINFORCED MASONRY PRE-GROUT | Cancelled | Cancel by contractor due to rain | |
| 12/06/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Rcmu At this inspection |
|
| 12/04/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Third lift on CMU walls filled with concrete and rebar. New commercial. | |
| 11/30/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | front wall | |
| 11/29/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Fourth lift, line A from Column one to column 6 | |
| 11/28/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1- This inspection was performed on 11/27/18 by other. | |
| 11/27/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1A to 5A | |
| 11/26/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | From column 4.7 to column 6 on line A. From line A to line D | |
| 11/21/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Column 4.3 to column in 5.3, row A.1. Third lift | |
| 11/20/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1- Masonry North wall 3rd lift from column line 1 to column line 4.3 okay for grout. | |
| 11/16/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1- Masonry second lift is okay to grout the North, East and South walls only. | |
| 11/14/2018 | REINFORCED MASONRY PRE-GROUT | Cancelled | ||
| 11/13/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 0 to 4‘ first lift |