Permit: T18CM04726

Parcel: 132130680

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T18CM04726

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
07/19/2019 EXCAVATION/LAYOUT REBAR & ZON Approved
04/04/2019 EXCAVATION/LAYOUT REBAR & ZON Cancelled Builder wanted footings for loading dock, however this was approved yesterday on another permit. Outside super not here, and will ascertain what is left for footings on the next visit.
12/19/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Light pole rebar North side.
10/16/2018 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection
09/27/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Doweling at south side ok.
09/18/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Area A and D perimeter footers and elevator footers ok

Area C and B ok
09/17/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval southside restrooms including risers for upper floors and floor drains
rebar inspected per plans 3 inch clearance maintain to earth I’ll bars grade 6060 interior pads for columns and exterior footings SW interior column footings from Good Brookline 6 to 10 and it gridlines BCD and E perimeter footing down Gridline be starting at grid One through six
09/14/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval COLUMN FOOTINGS FROM GRID LINE 6 TO GRID LINE 10
PERIMITER FOOTINGS DOWN GRID LINE B STARTING AT GRID 1 TO 6
09/10/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Exterior footings Gridline F 11 and Gridline B 6 Ok
09/10/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PADS PER PLAN 7E, 7D, 7C, 7B, 8B, 8C, 8D
09/07/2018 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*