Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2019 | FIRE - ALARM FINAL | Approved | ||
| 08/16/2019 | FIRE - ALARM FINAL | Partial Approval | One horn strobe needs to be synchronized Power supplies and FACP need to have dedicated primary perminanent power not tem power Need to label the power supplies and FACP with disconnectting means Need to install the graphic annunciator Need to put on the network to verify signals Need asbuilt fire alarm plans Need to test water flows, tampers, smokes and duct detectors |