Inspection Status: Approved
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/11/2018 |
ROOF NAILING |
|
Approved |
framing per engineers design |
| 09/06/2018 |
ROOF NAILING |
|
Correction Required |
Replace all swollen and water/weather damaged OSB Sheathing on the roof with new OSB Sheathing. Pictures. |
| 08/28/2018 |
ROOF NAILING |
|
Correction Required |
Plans call for trusses. Conventional rafters and 2x4 fill in have been used instead. Overspanned 2x4 ceiling joist has been installed. Build to plan or take all changes to COT for revisions made without approval. |
| 08/23/2018 |
ROOF NAILING |
|
Not ready for Inspection |
EVERY TRUSS NEEDS TO HAVE CLIPS TO REFLECT PRINT |
| 08/13/2018 |
ROOF NAILING |
|
Not ready for Inspection |
PLANS CALL FOR MANUFACTURED TRUSSES, THAT IS NOT WHAT IS BEING BUILT. EITHER BUILD PER PLANS OR HAVE PLANS REVISED TO REFLECT THE WORK ONSITE. |
| 05/15/2018 |
ROOF NAILING |
|
Prior to Intermediates |
ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION |