Permit: T18CM00899

Parcel: 11504498B


Addresses:

850 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: STEM WALL/RETAINING WALL

Date Description Inspector Results Comments
07/15/2019 STEM WALL/RETAINING WALL Approved
07/10/2019 STEM WALL/RETAINING WALL Not ready for Inspection I will need to meet with the contractor and other inspectors to ensure all work is complete.
10/18/2018 STEM WALL/RETAINING WALL Partial Approval STAIRWAY SHAFTS 1 & 2 LEVEL 3 TO 4 OK TO POUR
10/15/2018 STEM WALL/RETAINING WALL Partial Approval Stairway 1 level 2 ok to pour walls
10/12/2018 STEM WALL/RETAINING WALL Correction Required SOUTHWEST, SOUTHEAST, AND NORTHWEST CORNERS OF REINFORCING ARE MISSING TIES, NEED ADDITIONAL BARS, AND NEED TO BE RE-ALIGNED.
10/11/2018 STEM WALL/RETAINING WALL Not ready for Inspection CALLED FOR STAIRWAY SHAFT #1, NOT READY AT TIME OF INSPECTION.
10/10/2018 STEM WALL/RETAINING WALL Partial Approval elevator core and stairway at level two OK to pour
09/25/2018 STEM WALL/RETAINING WALL Partial Approval COLUMNS 2.3/A AND 2/A OK TO POUR WITH SPECIAL INSPECTOR APPROVED REPORT.
09/21/2018 STEM WALL/RETAINING WALL Partial Approval COLUMN E/3.2 OK TO POUR
09/20/2018 STEM WALL/RETAINING WALL Partial Approval COLUMN E/3.2 FIRST LEVEL OK TO POUR
09/14/2018 STEM WALL/RETAINING WALL Partial Approval ELEVATOR AND STAIRWAY CORE IN NE QUADRANT OK TO POUR LEVEL 2
08/30/2018 STEM WALL/RETAINING WALL Partial Approval SOUTH WALL OF STAIRWAY 2 FROM L 1 TO L 2 OK TO POUR
08/27/2018 STEM WALL/RETAINING WALL Partial Approval COLUMNS D/3.2, D/2, F/7 OK TO POUR
08/23/2018 STEM WALL/RETAINING WALL Partial Approval ELEVATED PORTION OF LEVEL 1, 3 COLUMNS ON GRID LINE 3.9 OK TO POUR
08/15/2018 STEM WALL/RETAINING WALL Partial Approval ALL COLUMNS LEVEL1 SOUTH OK TO POUR
08/07/2018 STEM WALL/RETAINING WALL Partial Approval GRID LINE E TO F.2/4 TO6 BASEMENT WALLS OK TO POUR
06/28/2018 STEM WALL/RETAINING WALL Partial Approval LOWEST LEVEL OF ELEVATOR PIT WALLS OK TO POUR