Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Shall provide a Mission Specialty coupling on the 11/2 vertical lavatory vent. 2- Shall locate the horizontal vent for the Tubs 6 inches above the flood level rim of the fixture. 3- Re test the system. |
|
| 06/26/2019 | PLUMBING - INTERMEDIATE | Approved | ||
| 06/25/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | 1- Contractor called and cancelled the inspection request. | |
| 06/24/2019 | PLUMBING - INTERMEDIATE | Denied | 1- Shall install the soil revent San Tees upside down for condensate drainage. 2- Shall complete the kitchen sink waste. 3- Shall provide a double fixture fitting for the back to back lavatory waste trap arms when the trap arms are less than 18 inches. 4- Re test the DWV system. |
|
| 06/21/2019 | PLUMBING - INTERMEDIATE | Cancelled | Canceled by contractor | |
| 06/20/2019 | PLUMBING - INTERMEDIATE | Denied | no tests | |
| 06/19/2019 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Contractor cancelled. |