Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T17RW01742
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | wing and sidewalk work is complete and in spec - they will also get a new lid for one of the boxes in the same area as it is warped - close permit | |
12/17/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | rick called me out to look at what they had reformed up for wing and sidewalk - one area was right at the 2.0 running slope they were advised to watch that area - they were going to pour it today - CN | |
12/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | contractor was removing the wing and sidewalk to redo the area to make it ada compliant as directed in yesterdays meeting by Matt - I also tried to contact rick with toffel to let him know that i hadnt seen any request for CFO yet - CN | |
12/13/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with rick about the driveway wing and landing it still wasnt in spec as the running slope was at 3.8% for landing - he wanted to argue with me again - i told him it was out of spec and would need to be replaced - i called pete and matt and let them know the issue and sent pictures of the problem also. | |
12/13/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Matt and i went back out and had a meeting with toffel - it was agreed that they would fix the area including the landing and make it all ada compliant and we would approve the tempary CFO under that condition once we recieved the CFO request - i would also close the permit once the work was completed - CN | |
11/28/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | talked with rick about the wing still being out of spec on the rear driveway and that his permit was expired - let pete know that he wanted to argue with me about the driveway | |
11/28/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | pete and i went back out to look at the wing that was out of spec - pete wanted it removed and replaced and painted to panels to be removed - CN | |
11/05/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | removing an area/wing by the back driveway that pete and i asked them to remove as it wasnt compliant. CN | |
10/26/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went out and checked the driveway and sidewalk poured on the south end of building - will have pete come out monday to look at one area that might need some work - CN | |
10/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with rick about sidewalk ramp on sw side of the building - traffic control up per plan - CN | |
10/11/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | looked at driveway on south side of the building had them make sure that the sidewalk area is ada - had matt come out and he said the same thing -CN | |
10/05/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went out and checked the sidewalk poured on broadway - traffic control setup per plan - CN | |
09/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | let permit holder know that permit was expired and needed to be renewed - CN | |
08/21/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | sidewalk pour all areas poured under 2% - CN | |
08/15/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | curb form inspection told them to get the water out and that they should be good to pour tomorrow providing it doesnt rain - CN | |
08/08/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | checked on the curb forms for the curb that got damaged on church - forms looked good so did the SG - CN | |
06/26/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | had them fix a few of there traffic control signs - everything else was good - CN | |
06/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | talked with david and asked him to renew his permit and to check all of the other permits - david called me back and said that he had contacted the barricade company and that they will be working on the renewal of the permit/s - CN | |
05/23/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control setup per plan - contractor was also informed to make sure that his permits were up to date - CN | |
04/27/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | investigated a complaint about not being able to get into the parking garage - didnt see any issues when i was on site - CN | |
04/05/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meeting at 9am pre - con about an up coming serwer tie in job on stone down franklin- gave them info on ped access and we talked about schedule and work to be done - i also checked jobsite traffic control - CN | |
03/22/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | talked with david about renewing the permit since it was expired. i also let him know that the asphalt patch was a little high on church and he said that they would be repvaing the area - CN | |
03/09/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | looked at the ab compaction for the electrical trench work they did in the church roadway - CN | |
01/29/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | checked out the traffic control everything looked good - CN | |
01/22/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | digging in rdwy of church - i sent an email to blanca and matt stating the scope of job hadnt been changed even though the tcp did - CN | |
01/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | talked to them about correcting the permit for the tep work being done in the chruch roadway - CN | |
12/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control looked good for the on going work - CN | |
11/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - traffic control looked good , ongoing work - CN | |
10/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - on going work, traffic control looked good - CN | |
10/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | went and talked to them about ROW on broadway. per blanca cause she said that they didnt have approval to close the sidewalk or do any work on that side. I told them to give blanca a call so that they could get it all worked out. | |
09/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | work still going on in the private property - CN | |
08/23/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | everything looked good - cn | |
08/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | construction entrance was made and ped access still available | |
07/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Meeting | - noon meeting to talk about a construction entrance and ped access | |
07/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict. | |
07/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict contractor working on demolition of building. | |
07/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict contractor working behind sidewalk. | |
07/10/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict. | |
07/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict. | |
06/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict right lane closed due to demo of building. | |
06/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Northbound right lane closed South of Broadway. | |
06/08/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Northbound right lane closed due to construction. | |
06/06/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict contractor putting chain link fence and barricades around project | |
05/30/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict contractor working in sidewalk area. | |
05/19/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | no work on site. | |
05/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | no work on site. |