Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: FCON – OH Piping & Hydro
| Date |
Description |
Inspector |
Results |
Comments |
| 04/19/2018 |
FCON – OH Piping & Hydro |
JPEELDAVIS |
Approved |
Entered by JPEELDA1 - All system areas 210 psi. Make sure that the duct work once wrapped is under the 48". If the wrapping exceeds the 48" you will need to add a head for proper coverage. |