Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
Permit Number - T17FC00923
Inspection Description - FIRE SPKLR - UG, PIPING, HYDRO
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2018 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | 3D Contractors to assume all liability for the underground line. Line was partialled and covered without hydro numerouse times. 3D and Brassfield Gorrie paperwork signed by them also stated that they were assuming liability | |
03/27/2018 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | ||
03/09/2018 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | wanted a PA on a section of UG. Told Juan we would accept Raytheons approval or to call it in for Monday since Inspector JPD knows the project and is allowing visual inspections. Juan will be taking pics. | |
01/10/2018 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | 1/3 of the building on the south side. 2 PIV, no pressure , no hydro, no flush. All will still need to be performed. This is a phase project. | |
12/28/2017 | FIRE SPKLR - UG, PIPING, HYDRO | Partial Approval | Ok to cover underground from pump house to building. Still need to hydro test. Supply to pump house still need full inspection. Extra inspection fee will apply as they will need several partials. 1 of 2. | |
12/26/2017 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | No access, gate closed not entry to Raytheon. |