Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2018 | FIRE - ALARM FINAL | Approved | ||
| 11/26/2018 | FIRE - ALARM FINAL | Partial Approval | I spoke to Steve this morning and the barrier "walls" will be constructed in the hallways (at the construction stairwell). The intent is to keep the workers separate from the tenants, so the wall might only be 4' tall (solid, without a door). Also, we spoke about the address on the Broadway side ... 12' numerals w/ 8 " letters. | |
| 11/15/2018 | FIRE - ALARM FINAL | Partial Approval | Tested the notification devices on the 1st, 2nd and 3rd floors. Tested the fire sprinkler flows: North Stairwell 41 seconds 1st floor 25 seconds South Stairwell 34 seconds 2n floor 35 seconds 3rd floor 32 seconds. Tested all control valves located on the 1st, 2nd and third floors. Confirmed the monitoring signals off site |