Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date |
Description |
Inspector |
Results |
Comments |
| 08/11/2017 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
Was sent to site by Administrator to view and assess the electrical damage. Uprooted tree pulled the primary feed to a 600 amp disconnect for 8 meters. The disconnect was riped from the wall. Cascade Electric was hired to replace the service and bring it up to codes. Permits will be obtained. |
| 08/10/2017 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
STORM DAMAGE CAUSE LARGE TREE TO FEEL ON TOP THE THIS STEEL GUARD AND CRUSHED IT, SECOND STORY APTS 215 AND 216 CONDEMNED UNSAFE EGRESS. PERMITS REQUIRED FOR REPAIRS |
| 08/10/2017 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
INSPECTOR VALDEZ AND GOODMAN ONSITE: MAJOR STORM DAMAGE |