Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T17DV02955
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2017 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITED SITE, MET WITH MANAGER CHARMALEE EVANS WHO INFORMED ME THAT THE A/C SYSTEM IS A CHILLER SYSTEM, IT WAS DOWN ON SATURDAY, REPAIRED AND BACK UP AND RUNNING. THIS AM THERE WAS A POWER SURGE, SYSTEM WENT DOWN BUT WAS RESET AND TURNED BACK ON. SYSTEM IS RUNNING BUT NOT PUTTING OUT COOL AIR. MANAGER ALREADY HAD CONTACTED T-D INDUSTRIIES AND THEY ARE ON THEIR WAY OUT. I SPOKE WITH MANAGER CARLOS WITH T-D INDUSTRIES WHO STATED THEIR TECNICHAN WILL BE THERE IN ABPIY 30 MINUTES. CONFIRMED THEY HAVE BEEN OUT RECENTLY AND IS SENDING SAME TECH THAT WAS THERE PREVIOULSY CHARMALEE EVANS STATED THAT MANAGEMENT OFFERED TENNANT IN K-62 A PORTABLE COOLING UNIT AND SHE REFUSED. MANAGERS OFFICE IS NOT WARM BUT PROBABLY 80 TO 82 DEGREES AND DROPPING. WORK IS IN PROGRESS. CALROS WILL CONTACT ME WHEN THEY HAVE ASSESSED THE CHILLER SYSTEM. WORK IN PROGRESS. COMPLIANCE / CLOSE CSE. |