Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T17DV00625

Parcel: 123022170


Addresses:

1929 N FORGEUS AV

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
02/11/2017 INSP - INITIAL CODE ENFORCMENT Approved A VEHICLE HIT THE NORTH EAST CORNER OF THE HOME, THE HOME IS SLUMP BLOCK TYPE CONSTRUCTION. THE IMPACT DID DESTROY A 20 FOOT SECTION OF THE FRONT SECTION OF THE EXTERIOR WALL, A 20 FOOT SECTION OF THE NORTH EXTERIOR WALL BEARING WAS ALSO DESTROYED. THE NE CORNER OF THE HOME HAD A MASONRY CHIMNEY WHICH WAS ALSO DESTROYED. THERE WERE 7 RAFTERS WERE DAMAGED, TWO WINDOWS WERE DAMAGED, ONE IS A 3 X 5 ENCASEMENT TYPE WINDOW THE OTHER IS A 3 X 5 PICTURE WINDOW. THERE IS WIRING AND FLEX CONDUIT WHICH WAS PULLED AND DAMAGED IN THIS AREA, THE MAIN DISCONNECT BREAKERS ARE OFF. ATTACHED TO THE NORTHSIDE OF THE HOME IS A 20 X20 WOOD FRAMED PATIO WITH 6 RAFTERS UNABLE TO SUPPORT ITS OWN WEIGHT DUE TO THE DAMAGED TO BEARING NORTH WALL. THE FRONT EXTERIOR WALL OF THE HOME HAS MULTIPLE CRACKING FROM THE FOUNDATION TO THE RIDGE AREA AND UNDER THE TILE ROOF COVERING.. THE ROOF COVERING TILES ALSO DAMAGE IN THIS AREA. POWER WAS TURNED BACK ON TO THE REAR GUEST HOUSE. THE MAIN DISCONNECT HAS NO MAIN BREAKER AND 7 CIRCUIT BREAKERS. PHOTOS IN SIRE