Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2018 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 05/25/2018 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE ISLAND SINK VENTING (CHICAGO LOOP) AS PER THE APPROVED PLANS. 2- SHALL PROVIDE A CONVENTIONAL ROUGH IN FOR THE MASTER BATH TUB AND SHOWER. 3- SHALL PROVIDE CLEAN FILL FOR THE BACKFILL, NO DIRT CLOGS ALLOWED. 4- NOTE; THE SUB FLOOR OVER THE BASEMENT HAS BEEN SCREWED DOWN AND IS OKAY * |