Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T17CM09357
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2018 | ENGINEERING - FINAL | Approved | ||
07/24/2018 | ENGINEERING - FINAL | Not ready for Inspection | COMPLETE THE EXTERIOR OF THE BUILDING PRIOR TO CALLING IN FOR THIS FIANL.TCO MAYBE GRANTED IF THERE IS SAFE AND CLEAR ACCESS AROUND THE PARKING LOT AND INTO THE BUILDING. THIS WILL MEAN THAT ALL STOCK PILES OF MATERIAL WILL HAVE TO BE REMOVE, AND ALL OPEN CONSTRUCTION WILL HAVE TO BE FENCED OFF TO PREVENT ACCES INTO AREAS UNDER CONSTRUCTION. | |
07/20/2018 | ENGINEERING - FINAL | Not ready for Inspection | SITE NOT READY AT THIS TIME. | |
07/20/2018 | ENGINEERING - FINAL | Not ready for Inspection | COMPLETE THE EXTERIOR WORK FOR THIS SITE AND ENSURE THAT ALL HANDICAP ITEM ARE READY FOR THE FINAL INSPECTION OF THE SITE | |
05/07/2018 | ENGINEERING - FINAL | Denied | CALL IN INSPECTION FOR RE-BAR LAY OUT INSPECTION UNDER PERMIT # DP16-0044 | |
04/02/2018 | ENGINEERING - FINAL | Continued | ||
03/26/2018 | ENGINEERING - FINAL | Continued | TRASH ENCLOSURE FOOTER OK ONLY. |