Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2019 | ELECTRIC - CONSTRUCTION POWER | Approved | Ok to energize for construction power, secondary lines in place to transformer (to be set by TEP). |