| 02/28/2019 |
COT - HCBU - Preslab |
RCAMACHO |
Approved |
Entered by CBELL1 - |
| 11/14/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - Level 1 slab garage GL-1-6 from A-E only |
| 11/08/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - 4" tie in to building domestic water |
| 10/11/2018 |
COT - HCBU - Preslab |
RCAMACH |
Partial Approval |
Entered by VFLORES1 - Potable yard water line 100 lb test 1" copper into building at garage column f/6 only |
| 08/06/2018 |
COT - HCBU - Preslab |
RCAMACH1 |
Not ready for Inspection |
Entered by RCAMACH1 - IVRS - Inspection :* |
| 07/12/2018 |
COT - HCBU - Preslab |
mramber1 |
Partial Approval |
Entered by MRAMBER1 - between C.L. Band C at 12.5 ok |
| 06/20/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Not ready for Inspection |
Entered by RCAMACH1 - |
| 06/15/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - 2 ELEVATOR DRAINS PENDING REVISION TO OMIT 1 DRAIN OF 3 |
| 06/14/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Not ready for Inspection |
Entered by RCAMACH1 - |
| 05/23/2018 |
COT - HCBU - Preslab |
BSTEVENS |
Not ready for Inspection |
Entered by BSTEVENS - |
| 05/10/2018 |
COT - HCBU - Preslab |
RBALDWIN |
Partial Approval |
Entered by RBALDWI2 - GRID LINES 1-3 A-C OK TO COVER |
| 12/18/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Approved |
Entered by CBELL1 - |
| 12/03/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - Level 1 garage grid line 1-6 from E- H only |
| 11/28/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - East patio only |
| 10/26/2018 |
COT - HCBU - Preslab |
rcamacho |
Partial Approval |
Entered by RCAMACH1 - Garage slab GL J-M from 1-6 |
| 10/29/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - fitness center slab only |
| 10/25/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Not ready for Inspection |
Entered by CBELL1 - |
| 10/22/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - GL 1-6 from E.5 - J |
| 10/16/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - GL 1-6 from A-E.5 GARAGE |
| 10/03/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Not ready for Inspection |
Entered by CMURPHY1 - |
| 10/02/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CMURPHY1 - Mech yard only |
| 10/01/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Not ready for Inspection |
Entered by CMURPHY1 - |
| 09/27/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Not ready for Inspection |
Entered by CMURPHY1 - |
| 09/24/2018 |
COT - HCBU - Preslab |
MRAMBER |
Partial Approval |
Entered by CMURPHY1 - north stairwell ok to pour. |
| 09/17/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CMURPHY1 - TES CALL CTR ROOM 3097
Elevator pit per detail 117 see rfi 281 10" oc each way top and bottom
Rooms 3091, 3093, 3094, 3095, 3096 & 3097
GL A-C from 11-14 LEVEL 3
|
| 09/13/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Not ready for Inspection |
Entered by CMURPHY1 - F-1 & F-2 footers Garage GL MG -FG from 1G- 6G 28 Footings total
See highlighted S1.1.0 plan
Completion of east exterior wall only
SES uaerd 1st lift only
2 x 2" & 1 x 1" from loading and receiving to trench C and to mech yard
Trench C to mech uard 5 x 3 1/2 " * 2 x 1" |
| 09/12/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CMURPHY1 - stairwell #1 only |
| 09/06/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CMURPHY1 - SES YARD EQUIPMENT PADS ONLY |
| 09/05/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CMURPHY1 - LEVEL 3 PATIO DECK AREA GL 3-4 ONLY
|
| 09/04/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by CMURPHY1 - Bottom matt 12" x 12" #3 bars SES YARD only
2010 partial
3 x 1" & 6 x 3" low voltage at bike yard only |
| 08/31/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Denied |
Entered by CMURPHY1 - |
| 08/15/2018 |
COT - HCBU - Preslab |
BSTEVENS |
Partial Approval |
Entered by BSTEVENS - LOBBY L 1 OK TO POUR |
| 08/13/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - COMPLETION OF CORE SLABS ONLY |
| 08/03/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Not ready for Inspection |
Entered by RCAMACH1 - |
| 08/02/2018 |
COT - HCBU - Preslab |
mramber1 |
Partial Approval |
Entered by MRAMBER1 - loading and recieving area ok |
| 08/01/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - AFTER HOURS INSPECTION $165.00 RECEIVED CHECK # 2709
MAKERS SPACE GL 10-13 1ST LEVEL |
| 08/01/2018 |
COT - HCBU - Preslab |
RCAMACH1 |
Not ready for Inspection |
Entered by RCAMACH1 - IVRS - Inspection :* |
| 07/27/2018 |
COT - HCBU - Preslab |
BSTEVENS |
Partial Approval |
Entered by BSTEVENS - LEVEL 1 FROM GL 10-14 / A-C OK TO POUR WITH SPECIAL INSPECTOR APPROVAL FOR EPOXY DOWELS. |
| 07/26/2018 |
COT - HCBU - Preslab |
RCAMACH1 |
Partial Approval |
Entered by RCAMACH1 - 6" DEPRESSED SLAB ICIDO ROOM ONLY |
| 07/18/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - GL A-C FROM 3-10 ONLY LEVEL 1 |
| 07/13/2018 |
COT - HCBU - Preslab |
mramber1 |
Partial Approval |
Entered by MRAMBER1 - north half within bldg ok |
| 07/02/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - STAIRWELL 2 ONLY |
| 07/02/2018 |
COT - HCBU - Preslab |
RCAMACH1 |
Partial Approval |
Entered by RCAMACH1 - IVRS - Inspection :* |
| 06/22/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - 2ND FLOOR CORE EXCEPT STAIRWELLS |
| 06/21/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - LEVEL 3 CORE EXCEPT STAIRWELLS |
| 06/19/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - STAIRWELL 2 ONLY |
| 06/14/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - ROOF DECK EQUIPMENT PAD ONLY |
| 06/12/2018 |
COT - HCBU - Preslab |
BBENEDO1 |
Partial Approval |
Entered by BBENEDO1 - l-3 south |
| 06/06/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - LEVEL 3 NORTH POUR TO GL 4 ONLY |
| 06/01/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - DRAG BARS FROM MASONRY PER DETAIL 351 ABOVE SLAB HEIGHT. PROVIDE ENGINEER FIX LEVEL 2 SOUTH ONLY |
| 05/23/2018 |
COT - HCBU - Preslab |
BSTEVENS |
Partial Approval |
Entered by BSTEVENS - LEVEL 2 NORTH SLAB OK TO POUR |
| 04/25/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Partial Approval |
Entered by RCAMACH1 - STAIRWELL 3 ONLY |
| 04/24/2018 |
COT - HCBU - Preslab |
RCAMACHO |
Not ready for Inspection |
Entered by RCAMACH1 - |