Permit: T17CM08953

Parcel: 11620134B


Addresses:

875 W CUSHING ST

Inspection Status: Passed

Inspection History: COT - HCBU - Framing

Date Description Inspector Results Comments
02/15/2019 COT - HCBU - Framing RCAMACHO Approved Entered by CBELL1 -
02/08/2019 COT - HCBU - Framing BSTEVENS Not ready for Inspection Entered by CBELL1 - Recall these inspections
02/05/2019 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CBELL1 - Fitness center only
01/16/2019 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CBELL1 - Hard lids 1116, 1113, 1112, 1105, 1106 and 1103 Clouds GL A-C from 6-8 Rooms1062, 1074- 1079
12/17/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CBELL1 - level one Gridline 3 to 5 from A-C three out of four clouds only
12/07/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CBELL1 - Soffitt level 1 lobby only
12/05/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CBELL1 - Level 1 Gridline 1 -3 from A-C provide proper bracing lobby soffit
11/20/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CBELL1 - stairwell 3 all levels exterior walls only
11/05/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CBELL1 - Shipping and receiving area only
10/17/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CBELL1 - Level 2 except west rooms walls
10/04/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CMURPHY1 - Stairwell 1 furrouts at stairs and landings except bolts at level 1 landing over exit door
09/28/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CMURPHY1 - Lobby levels 1 & 2 Furrout ext. Wall GL 1 from A-B Level 3 GL 4- 11from A-C
09/26/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CMURPHY1 - Levels 1,2&3 core restroom walls only
09/17/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CMURPHY1 - TES CALL CTR ROOM 3097 Elevator pit per detail 117 see rfi 281 10" oc each way top and bottom Rooms 3091, 3093, 3094, 3095, 3096 & 3097 GL A-C from 11-14 LEVEL 3
09/14/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CMURPHY1 - Exterior west patio wall GL 4 from A-C
09/13/2018 COT - HCBU - Framing RCAMACHO Not ready for Inspection Entered by CMURPHY1 - F-1 & F-2 footers Garage GL MG -FG from 1G- 6G 28 Footings total See highlighted S1.1.0 plan Completion of east exterior wall only SES uaerd 1st lift only 2 x 2" & 1 x 1" from loading and receiving to trench C and to mech yard Trench C to mech uard 5 x 3 1/2 " * 2 x 1"
09/05/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by CMURPHY1 - EXTERIOR WALLS GL1&2 WRST END ONLY
08/17/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by RCAMACH1 - GL A FROM 10-14 EXTERIOR WALLS ONLY WITH EXTERIOR SOFFITS
08/07/2018 COT - HCBU - Framing RCAMACHO Partial Approval Entered by RCAMACH1 - SOUTH WALL 2ND LIFT TO TOP OUT EXCEPT GL 4-5 WEST OF CORE
07/06/2018 COT - HCBU - Framing RCAMACHO Denied Entered by RCAMACH1 - PER VSC DETAIL 16/D2 NO MORE THAN 1" MAX GAP BETWEEN STUD AND BUILDING GL A FROM 4-11 ONLY