Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - HCME - Hydronic Piping
| Date |
Description |
Inspector |
Results |
Comments |
| 02/28/2019 |
COT - HCME - Hydronic Piping |
RCAMACHO |
Approved |
Entered by CBELL1 - |
| 09/19/2018 |
COT - HCME - Hydronic Piping |
RCAMACHO |
Partial Approval |
Entered by CMURPHY1 - Chill water 6 inch line 80 lb PSI test okay to insulate
refrigerant lines 750 lb PSI test 3rd floor 2nd floor and shaft only |
| 09/14/2018 |
COT - HCME - Hydronic Piping |
RCAMACHO |
Not ready for Inspection |
Entered by CMURPHY1 - Tes call center room 3597 Tes Tech Lab room 3096 Tes remote Moon Room 3095 Tes War Room 3094 open offices rooms 3091 and 3093
Mech yard only
No test
Shaft 1 condensate line only
Mechanical shaft number 1 and 3 complete shaft number 2 except exhaust all hard duct GL 10 to 14 from A to C okay to insulate
|
| 02/22/2018 |
COT - HCME - Hydronic Piping |
mramber1 |
Partial Approval |
Entered by MRAMBER1 - 100 psi test ok at S.E. corner, provide hydrostatic test when system complete |