Inspection Status: Canceled
Inspection History: COT - HCBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2022 |
COT - HCBU - Building Final |
|
Canceled |
Inspection Canceled |
| 04/18/2019 |
COT - HCBU - Building Final |
RCAMACHO |
Partial Approval |
Entered by DMERANZ1 - Pending fire and engineering finals
Pending chlorination report from Bob Sherry
WAS PREVIOUSLY APPROVED, REOPENED DUE TO OTHER MISSING INSPECTIONS |
| 01/17/2019 |
COT - HCBU - Building Final |
RCAMACHO |
Partial Approval |
Entered by AMARTIN1 - |
| 04/08/2019 |
COT - HCBU - Building Final |
RCAMACHOI |
Partial Approval |
Entered by CBELL1 - ADA water closet not to exceed 18 inches from wall Fitness center
Install ADA mirrors fitness center restrooms
Pending air balance report and chlorination report to Bob Sherry |
| 03/05/2019 |
COT - HCBU - Building Final |
TVALENCIA |
Partial Approval |
Entered by CBELL1 - 1- First floor is okay for temp C of O |
| 01/17/2019 |
COT - HCBU - Building Final |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - Level two only fire seal caulk all penetrations 2-hour firewall storage room
Seal penetration at fire shaft at duck work in core |
| 12/18/2018 |
COT - HCBU - Building Final |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - level 3 ada water closet men’s restroom may not exceed 18 inches from wall
level 3 women’s restroom ada counter may not exceed 34 inches
Pending fire & engineering, pending air balance report and chlorination report to Bob Sherry OK to apply for temporary CEO level 3 only |
| 11/14/2018 |
COT - HCBU - Building Final |
RCAMACHO |
Partial Approval |
Entered by CBELL1 - Level 1 slab garage GL-1-6 from A-E only |
| 10/29/2018 |
COT - HCBU - Building Final |
RCAMACHO |
Not ready for Inspection |
Entered by CBELL1 - |
| 09/13/2018 |
COT - HCBU - Building Final |
RCAMACHO |
Partial Approval |
Entered by CMURPHY1 - F-1 & F-2 footers Garage GL MG -FG from 1G- 6G 28 Footings total
See highlighted S1.1.0 plan
Completion of east exterior wall only
SES uaerd 1st lift only
2 x 2" & 1 x 1" from loading and receiving to trench C and to mech yard
Trench C to mech uard 5 x 3 1/2 " * 2 x 1"
|