Permit: T17CM08953

Parcel: 11620134B


Addresses:

875 W CUSHING ST


Inspection Status: Canceled

Inspection History: COT - HCBU - Building Final 

Permit Number - T17CM08953

Inspection Description - COT - HCBU - Building Final 

Inspection Status - Canceled

Date Description Inspector Results Comments
11/07/2022 COT - HCBU - Building Final  Canceled Inspection Canceled
04/18/2019 COT - HCBU - Building Final  RCAMACHO Partial Approval Entered by DMERANZ1 - Pending fire and engineering finals Pending chlorination report from Bob Sherry WAS PREVIOUSLY APPROVED, REOPENED DUE TO OTHER MISSING INSPECTIONS
01/17/2019 COT - HCBU - Building Final  RCAMACHO Partial Approval Entered by AMARTIN1 -
04/08/2019 COT - HCBU - Building Final  RCAMACHOI Partial Approval Entered by CBELL1 - ADA water closet not to exceed 18 inches from wall Fitness center Install ADA mirrors fitness center restrooms Pending air balance report and chlorination report to Bob Sherry
03/05/2019 COT - HCBU - Building Final  TVALENCIA Partial Approval Entered by CBELL1 - 1- First floor is okay for temp C of O
01/17/2019 COT - HCBU - Building Final  RCAMACHO Partial Approval Entered by CBELL1 - Level two only fire seal caulk all penetrations 2-hour firewall storage room Seal penetration at fire shaft at duck work in core
12/18/2018 COT - HCBU - Building Final  RCAMACHO Partial Approval Entered by CBELL1 - level 3 ada water closet men’s restroom may not exceed 18 inches from wall level 3 women’s restroom ada counter may not exceed 34 inches Pending fire & engineering, pending air balance report and chlorination report to Bob Sherry OK to apply for temporary CEO level 3 only
11/14/2018 COT - HCBU - Building Final  RCAMACHO Partial Approval Entered by CBELL1 - Level 1 slab garage GL-1-6 from A-E only
10/29/2018 COT - HCBU - Building Final  RCAMACHO Not ready for Inspection Entered by CBELL1 -
09/13/2018 COT - HCBU - Building Final  RCAMACHO Partial Approval Entered by CMURPHY1 - F-1 & F-2 footers Garage GL MG -FG from 1G- 6G 28 Footings total See highlighted S1.1.0 plan Completion of east exterior wall only SES uaerd 1st lift only 2 x 2" & 1 x 1" from loading and receiving to trench C and to mech yard Trench C to mech uard 5 x 3 1/2 " * 2 x 1"