Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T17CM07765
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/15/2019 | FIRE - FINAL | Approved | ||
02/21/2019 | FIRE - FINAL | Partial Approval | Need to add the address on both sides Generator power transfer was 14 seconds and needs to be 10 Checking with Raytheon Fire re:emergency lights |
|
01/17/2019 | FIRE - FINAL | Partial Approval | Items remaining from Punch List on 11/29/18. 1. Test emergenct and primary power once installed. 2. Verify candella rating. 3. Need Building number sign. Items cleared from Punch List 11/29/18. 1. FDC and Control Valve signs installed. 2. Painted sprinkler head cleared. 3. Duct Fire Smoke Detectors installed and tested ok. |
|
11/29/2018 | FIRE - FINAL | Partial Approval | OK FOR TCO Need to complete some small items: Test the emergency and primary power once it is installed Need to check a few items on the fire alarm sytsem Need to have the duct fire smoke detectors installed in the HVAC units Need to have the building address installed Need to order the FDC and Control Valve signs Fire sprinkler is 99% approved minus needing to replace one painted head. Fire alarm system needs to have the candella rating confirmed. Priamry power confirmed and a few other small items. |