Permit: T17CM07498

Parcel: 11202003D

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
06/15/2018 PLUMBING - INTERMEDIATE Approved
06/13/2018 PLUMBING - INTERMEDIATE Partial Approval LEVEL #1 (EAST), MRI ROOM HEAT EXCHANGER (1 1/2" LINES TESTEFD AT 60 PSI) OK TO INSULATE
05/23/2018 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, WEST PORTION: BLENDED HOT WATER - CHILLED WATE LINES 3/4" - 4" TESTED AT 100 PSI. OK TO INSULATE LINES
05/04/2018 PLUMBING - INTERMEDIATE Not ready for Inspection LEVEL #3, EAST: CHILLED BEAM WATER LINES TESTED AT 80 PSI: REQUIRED TO BE TESTED AT 100 PSI.
03/21/2018 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, EATS PORTION: HEATED HOT WATER SYSTEM LINES AT 34" - 2 1/2". OK TO INSULATE PROGRESS AREAS.
03/16/2018 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, EAST: HEATED HOT WATER - 3/4" - 2" LINES; (NORTH AND EAST AREAS).
03/14/2018 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, EST: DOMESTIC HOT/COLD WATER LINES: 1/2" - 2": ALL LINES UNDER TEST AT 100 PSI.
03/06/2018 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, WEST: WASTE AND VENT LINES AT 2" - 4"; GL: D-G/3-7
03/01/2018 PLUMBING - INTERMEDIATE Partial Approval DOMESTIC HOT AND COLD WATER LINES (1/2" - 2") : BATHROOMS AND LAVS AT GL: F-G/14.
02/28/2018 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, EAST: WASTE AND VENT LINES AT GL: F-G/14-17; 2" - 4" LINES TESTED AT 7 PSI. DOMESTIC HOT AND COLD WATER LINES (IN WALLS), GL: E- G.5/15-18 (1/2" - 2") LINES, TESTED AT 100PSI. OK TO INSULATE PROGRESS AREAS.
02/27/2018 PLUMBING - INTERMEDIATE Partial Approval WASTE AND VENT LINES (2" - 4") AT GL: D-H/14-19 AT LEVEL #3; EAST PORTION OF BUILDING.
01/16/2018 PLUMBING - INTERMEDIATE Partial Approval LEVEL #3, EAST, 1 1/2" WASTE LINES UNDER TEST EXCEPT FOR AREAS G-17, G-16 (GAUGES NOT UP TO TEST LEVEL)