Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2017 | REINFORCED MASONRY PRE-GROUT | Approved | OK TO TOP-OUT AND ROUT COLUMN AT 8' - 12' | |
| 11/16/2017 | REINFORCED MASONRY PRE-GROUT | Partial Approval | COLUMN 4' TO 8' | |
| 11/15/2017 | REINFORCED MASONRY PRE-GROUT | Partial Approval | WEST WALL TOP OUT BOTTOM OF WINDOW COLUMN 0' TO 4' |
|
| 11/14/2017 | REINFORCED MASONRY PRE-GROUT | Partial Approval | VENEER SECTION AT TOP OUT 8" CMU SECTION- 8' TO 13' |
|
| 11/09/2017 | REINFORCED MASONRY PRE-GROUT | Partial Approval | FIRST LIFT AT 0' TO 4'. OK TO GROUT PROGRESS AREA. | |
| 10/26/2017 | REINFORCED MASONRY PRE-GROUT | Partial Approval | INFORMATION ONLY: 1. ENERGY EFFICIENT REPLACEMENT LIGHTING WILL BE REQUIRED. 2. ADA FRONT DOOR WILL REQUIRE COMPLIANT DOORS/THRESHOLDS. WILL CHECK WITH FIRE INSPECTOR FOR EGRESS ISSUES AND HARDWARE REQUIRED FOR DOORS. 3. GLASS REPLACEMENT: TEMPERED GLASS WILL BE REQUIRED; EXTENT OF REPLACEMENT TO BE DETERMINED AS PER IBC. 4. SUGGEST A SCHEDULED FIRE DEPARTMENT PRE-INSPECTION WALK THROUGH BE ACCOMPLISHED BEFORE REPAIR CONSTRUCTION BEGINS. |