Permit: T17CM06789

Parcel: 11620134B


Addresses:

875 W CUSHING ST


Inspection Status: Not ready for Inspection

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T17CM06789

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Not ready for Inspection

Date Description Inspector Results Comments
02/28/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection no work. Contractor to call in all open inspections for review
02/28/2019 EXCAVATION/LAYOUT REBAR & ZON Approved
09/28/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Garage columns GL A-E from 1-6
09/26/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Garage columns GL F-M from 1-6 28 columns total steel o ly with grade

See typical concrete column reinforcing detail
09/25/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval column A/4 f-3 footer garage only
04/06/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval NORTH CMU RETAINING WALL FOOTING FROM GRIDLINE 1 TO 5.5
02/26/2018 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection no approved plans on site
02/12/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PRE INSPECTION GRID LINE C FROM 3-8.2 GRADE BEAM 3
GRID LINE D FROM 6-8.2 TO INCLUDE CORE
02/09/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL 'C' FROM 3 TO 8.2 AND 'D' FROM 6 TO 8.2 (CORE AREA) OK TO POUR
02/07/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GRID LINE C FROM 8.1 TO 13.7 INCLUDING STAIRWELL AND ELEVATOR GRADE BEAMS
02/05/2018 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection WORK NOT COMPLETE ENOIUGH TO INSPECT
02/01/2018 EXCAVATION/LAYOUT REBAR & ZON Denied PROVIDE CLEARANCE 3" FROM STEEL THROUGHOUT
COMPLETE ALL RINGS AT COLUMN A-1
01/31/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GRADE BEAM GRID LINE A FROM 10.5 TO 13.7
GRADE BEAMS AT STAIRWELL AND ELEVATOR
GRADE BEAMS GRID LINE 13.7 FROM A TO D.6
GRADE BEAMS GRID LINE D.6 FROM 13.7 TO 11.5
GRADE BEAMS GRID LINE 11.5 FROM D.6 TO C
SEE HIGHLIGHTED AREA
SEE RFI CORNER BARS AND STANDARD HOOKS
01/26/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GRADE BEAM-4 SEE RFI
SEE HIGHLIGHTES AREA PER DETAIL 115
GRID LINE 13 FROM A-A.2 AND B.7 TO C.5
01/24/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GRADE BEAM FOOTER PER DETAIL 103 GRID LINE A FROM 3-1.2
01/23/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval BOLTS COLUMNS A-3 TO A-10 ONLY
01/19/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval BOLTSCOLUMN B.7/2
BOLTS COLUMN C.6/1.4, C.6/1.9 AND C.6/2.4
BOLTS COLUMN B/7
BOLTS COLUMN C/12
BOLTS COLUMN A/12
01/17/2018 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
12/28/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LINE B OK TO POUR TOPS TO BOLTS
12/26/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval caisson F-2 at G.L. C.8/5.6 ok
12/21/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAISSONS ONLY
F/7.2 C8/13.6 D.6/11.5
F/8.4 C/11.5 D.6/12.4
C.8/11.5 D.6/13.0
COLUMN AB'S GRID LINE B FROM 1-13
CAGE ONLY
CF2 C/8/12.6 ONLY
12/20/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAISSONS ONLY C/8 AND C/10
CAGES ONLY CF1-F/8.4 AND CF1-C/8-13.6
12/15/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAISSONS ONLY
C/4 C/9 D/7 D/5 F/9.5
C/5.5 E/8.4 D/8 D/6
C/7 E/9.5 D/9 E/7.2 D/10
12/14/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval A.2/13 C/5
C/2 C/6
C/11 C/3
D/9.6 C.5/9.6
SEE HIGHLIGHTED PLAN
12/12/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAGES ONLY
CF2-D/5.3
CF2-D/10 ?
CF2-E/8.4
CAISSONS ONLY
13/C.4 13.2/A.6 9.2/C
8.5/C 7.5/C 6.5/C
2/B.7 7.1/A 4.1/A
2/C.4 3/C.4 2.4/C.6
2/C.6 1.4/C.6
12/08/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAGES ONLY
CF3-C/11 CF3-D/7.9
CF3-C/9.5 CF3-D/9.2
CF3-C/8.5 CF3-D/8.6
CF1-C8/11.5 CF3-D/8.6
CF3-D/7.2
CAISSONS ONLY
A/13, B/3.1, B/6.1, C4/1 ONLY
12/07/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAGES ONLY
CF2-A/3.1 CF5-9/C
CF5- 8/C CF1-C.6/2.4
CF3-D1/6.4 CF3-C/6.5
CF1-E/7.2 CF1-C.6/2
CF1-C.11/3
CAISSONS ONLY
B/2, B/3, A1, A/2, A/3, A/4 AND A/D
12/06/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAGES ONLY
CF-5-C/6 CF-1-F/7.2
CF-3-C/5.5 CF-1-F/9.4
CF-1-E/9.4 CF-3-C/4
CF-5-C/7 CF-3-B/7.2

CAISSONS ONLY
A/6, A/7, A/8, A/12, B/4, B/5 ONLY
12/05/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAGES ONLY
CF-5-B/3 CF-6-C/3 CF-3-A/7
CF-5-C/12 CF-2-A/2 CF-3-A/6
CF-3-B/2 CF-3-A/4 CF-3-A/5
CF2.1-C/4 CF-5-C/5 CF3-A/8
CF-3-A/3 CF-6-B/5 CF1.3-C/4
CF-2-D/5.3 CF1.2-C/4 CF-5-B/4
CF-2-A/A CF-2-B/3.1

CAISSONS ONLY
CF-6-13/B.7 CF-3-13.7/A.2 CF-6-B/6
CF-1-13.7/C CF3-A/9 CF-6-B/7
CF-1-B.2 CF-3-A/10 CF6-B/8
CF-3-13.7/A.7
12/01/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAISSONS
A-10 AND A-9 ONLY
CAGES
CF-3-A/11
CF-3-A/10
CF-3-A/9
CF-6-B/7
CF-6-B/6
CF-6-B/8 ONLY
11/30/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CAGES ONLY
CF.5-B/4, CF.6-B/10, CF.6-9/B, CF.1-B/5-13.7
CF.1-B/1-13.7, CF.1-CF.1-D/6-12.5, CF.1-12.6, CF.6-13-A, CF.1/8-13.6, CF.1-D/6-13.7, CF.6-13, CF.6-13/B, CF.6-13/A.3, CF.5-C/12,AND CF.2-C8/12.6

CAISONS ONLY
CF.5-B/13, CF.6-B/12 AND CF.6-B/11 ONLY
11/29/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval CF-3-A/4, CF3-A/5, CF3-A/3, CF5-B/13, CF6-B/12, CF6-B/11
CAGES ONLY