Inspection Status: Not ready for Inspection
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T17CM06789
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | no work. Contractor to call in all open inspections for review | |
02/28/2019 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
09/28/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Garage columns GL A-E from 1-6 | |
09/26/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | Garage columns GL F-M from 1-6 28 columns total steel o ly with grade See typical concrete column reinforcing detail |
|
09/25/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | column A/4 f-3 footer garage only | |
04/06/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | NORTH CMU RETAINING WALL FOOTING FROM GRIDLINE 1 TO 5.5 | |
02/26/2018 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | no approved plans on site | |
02/12/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | PRE INSPECTION GRID LINE C FROM 3-8.2 GRADE BEAM 3 GRID LINE D FROM 6-8.2 TO INCLUDE CORE |
|
02/09/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | GL 'C' FROM 3 TO 8.2 AND 'D' FROM 6 TO 8.2 (CORE AREA) OK TO POUR | |
02/07/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | GRID LINE C FROM 8.1 TO 13.7 INCLUDING STAIRWELL AND ELEVATOR GRADE BEAMS | |
02/05/2018 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | WORK NOT COMPLETE ENOIUGH TO INSPECT | |
02/01/2018 | EXCAVATION/LAYOUT REBAR & ZON | Denied | PROVIDE CLEARANCE 3" FROM STEEL THROUGHOUT COMPLETE ALL RINGS AT COLUMN A-1 |
|
01/31/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | GRADE BEAM GRID LINE A FROM 10.5 TO 13.7 GRADE BEAMS AT STAIRWELL AND ELEVATOR GRADE BEAMS GRID LINE 13.7 FROM A TO D.6 GRADE BEAMS GRID LINE D.6 FROM 13.7 TO 11.5 GRADE BEAMS GRID LINE 11.5 FROM D.6 TO C SEE HIGHLIGHTED AREA SEE RFI CORNER BARS AND STANDARD HOOKS |
|
01/26/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | GRADE BEAM-4 SEE RFI SEE HIGHLIGHTES AREA PER DETAIL 115 GRID LINE 13 FROM A-A.2 AND B.7 TO C.5 |
|
01/24/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | GRADE BEAM FOOTER PER DETAIL 103 GRID LINE A FROM 3-1.2 | |
01/23/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | BOLTS COLUMNS A-3 TO A-10 ONLY | |
01/19/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | BOLTSCOLUMN B.7/2 BOLTS COLUMN C.6/1.4, C.6/1.9 AND C.6/2.4 BOLTS COLUMN B/7 BOLTS COLUMN C/12 BOLTS COLUMN A/12 |
|
01/17/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* | |
12/28/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | LINE B OK TO POUR TOPS TO BOLTS | |
12/26/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | caisson F-2 at G.L. C.8/5.6 ok | |
12/21/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAISSONS ONLY F/7.2 C8/13.6 D.6/11.5 F/8.4 C/11.5 D.6/12.4 C.8/11.5 D.6/13.0 COLUMN AB'S GRID LINE B FROM 1-13 CAGE ONLY CF2 C/8/12.6 ONLY |
|
12/20/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAISSONS ONLY C/8 AND C/10 CAGES ONLY CF1-F/8.4 AND CF1-C/8-13.6 |
|
12/15/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAISSONS ONLY C/4 C/9 D/7 D/5 F/9.5 C/5.5 E/8.4 D/8 D/6 C/7 E/9.5 D/9 E/7.2 D/10 |
|
12/14/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | A.2/13 C/5 C/2 C/6 C/11 C/3 D/9.6 C.5/9.6 SEE HIGHLIGHTED PLAN |
|
12/12/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAGES ONLY CF2-D/5.3 CF2-D/10 ? CF2-E/8.4 CAISSONS ONLY 13/C.4 13.2/A.6 9.2/C 8.5/C 7.5/C 6.5/C 2/B.7 7.1/A 4.1/A 2/C.4 3/C.4 2.4/C.6 2/C.6 1.4/C.6 |
|
12/08/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAGES ONLY CF3-C/11 CF3-D/7.9 CF3-C/9.5 CF3-D/9.2 CF3-C/8.5 CF3-D/8.6 CF1-C8/11.5 CF3-D/8.6 CF3-D/7.2 CAISSONS ONLY A/13, B/3.1, B/6.1, C4/1 ONLY |
|
12/07/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAGES ONLY CF2-A/3.1 CF5-9/C CF5- 8/C CF1-C.6/2.4 CF3-D1/6.4 CF3-C/6.5 CF1-E/7.2 CF1-C.6/2 CF1-C.11/3 CAISSONS ONLY B/2, B/3, A1, A/2, A/3, A/4 AND A/D |
|
12/06/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAGES ONLY CF-5-C/6 CF-1-F/7.2 CF-3-C/5.5 CF-1-F/9.4 CF-1-E/9.4 CF-3-C/4 CF-5-C/7 CF-3-B/7.2 CAISSONS ONLY A/6, A/7, A/8, A/12, B/4, B/5 ONLY |
|
12/05/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAGES ONLY CF-5-B/3 CF-6-C/3 CF-3-A/7 CF-5-C/12 CF-2-A/2 CF-3-A/6 CF-3-B/2 CF-3-A/4 CF-3-A/5 CF2.1-C/4 CF-5-C/5 CF3-A/8 CF-3-A/3 CF-6-B/5 CF1.3-C/4 CF-2-D/5.3 CF1.2-C/4 CF-5-B/4 CF-2-A/A CF-2-B/3.1 CAISSONS ONLY CF-6-13/B.7 CF-3-13.7/A.2 CF-6-B/6 CF-1-13.7/C CF3-A/9 CF-6-B/7 CF-1-B.2 CF-3-A/10 CF6-B/8 CF-3-13.7/A.7 |
|
12/01/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAISSONS A-10 AND A-9 ONLY CAGES CF-3-A/11 CF-3-A/10 CF-3-A/9 CF-6-B/7 CF-6-B/6 CF-6-B/8 ONLY |
|
11/30/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CAGES ONLY CF.5-B/4, CF.6-B/10, CF.6-9/B, CF.1-B/5-13.7 CF.1-B/1-13.7, CF.1-CF.1-D/6-12.5, CF.1-12.6, CF.6-13-A, CF.1/8-13.6, CF.1-D/6-13.7, CF.6-13, CF.6-13/B, CF.6-13/A.3, CF.5-C/12,AND CF.2-C8/12.6 CAISONS ONLY CF.5-B/13, CF.6-B/12 AND CF.6-B/11 ONLY |
|
11/29/2017 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CF-3-A/4, CF3-A/5, CF3-A/3, CF5-B/13, CF6-B/12, CF6-B/11 CAGES ONLY |