Permit: T17CM04982

Parcel: 11712099A


Addresses:

20 S STONE AV


Inspection Status: Approved

Inspection History: BUILDING - PROGRESS

Permit Number - T17CM04982

Inspection Description - BUILDING - PROGRESS

Inspection Status - Approved

Date Description Inspector Results Comments
06/22/2020 BUILDING - PROGRESS Approved Approved
06/17/2020 BUILDING - PROGRESS Partial Approval Partial. Pre-Certificate of Occupancy walk through. Will call for Final on 22 June.
05/29/2020 BUILDING - PROGRESS Partial Approval Partial. Information for possible “occupancy “ in name only, under current TCO. Referred to A. Quiroz for disposition.
05/28/2020 BUILDING - PROGRESS Partial Approval Partial. Level #1; Electric room finals, Rooms: D; G; Amenities Room.
05/27/2020 BUILDING - PROGRESS Partial Approval Partial. Level #1; Room units #102; 104; 106: electric complete.
05/26/2020 BUILDING - PROGRESS Partial Approval Partial. Steps, benches, planters (01005) in courtyard center section. Ok to place concrete.
05/01/2020 BUILDING - PROGRESS Partial Approval
04/29/2020 BUILDING - PROGRESS Partial Approval RVI Partial. (VRI). Information only.
04/28/2020 BUILDING - PROGRESS Not ready for Inspection Not ready. Level #6 unit rooms will be ready for Electric Finals on 29 April.
04/27/2020 BUILDING - PROGRESS Partial Approval Partial. Set schedule for room electric final inspections on Level #6.
04/24/2020 BUILDING - PROGRESS Denied 1- There was no contact number given on the inspection request. Please provide a contact number of the person who will be performing the video inspection at the time inspection request. I spoke with the office today at (480) 222-9103 and asked to contacted today before 3:00 pm.
04/23/2020 BUILDING - PROGRESS Partial Approval
04/22/2020 BUILDING - PROGRESS Partial Approval RVI Schedule for meter sets
04/21/2020 BUILDING - PROGRESS Partial Approval (VRI). 02036. Level #1; Lobby area and mail room; canned lighting system.
04/20/2020 BUILDING - PROGRESS Partial Approval
04/15/2020 BUILDING - PROGRESS Partial Approval RVI Stairwell #3 sheetrock
04/14/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled, will reschedule for 15 April
04/13/2020 BUILDING - PROGRESS Partial Approval RVI-SET SCHEDULE FOR ROOM INSPECTIONS
04/10/2020 BUILDING - PROGRESS Partial Approval RVI Interior courtyard planters. Reference RFI #352.
04/09/2020 BUILDING - PROGRESS Partial Approval Set schedule for room final inspections.
04/08/2020 BUILDING - PROGRESS Partial Approval VRI
04/07/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled
04/06/2020 BUILDING - PROGRESS Not ready for Inspection RVI-Contractor cancelled; will reschedule for 8 April.
04/03/2020 BUILDING - PROGRESS Partial Approval (RVI). (01005). Patch and repair stem walls at South area; Southeast area; Southwest corner area. Ok to place concrete in progress areas.
04/02/2020 BUILDING - PROGRESS Not ready for Inspection will reschedule for 3 April.
04/01/2020 BUILDING - PROGRESS Partial Approval Setting up for Face Time
03/31/2020 BUILDING - PROGRESS Partial Approval
03/27/2020 BUILDING - PROGRESS Cancelled Canceled by contractor.
03/26/2020 BUILDING - PROGRESS Partial Approval Level #1; Shower pans in units #102; 104; 106; 116; 118.
03/25/2020 BUILDING - PROGRESS Partial Approval Trash chutes at Levels #1-6; (01044). Ok to cover walls to be rated at two hours.
03/11/2020 BUILDING - PROGRESS Cancelled Canceled by contractor.
03/09/2020 BUILDING - PROGRESS Partial Approval Information only.
03/06/2020 BUILDING - PROGRESS Partial Approval Information only. 03005. Partial. Level #1; Public Restrooms: 1/2" domestic water, 2" waste. Ok to cover progress areas. 03035. Partial. Level #6; Unit shower pans: 611; 612; 614; 616; 618; 619.
03/05/2020 BUILDING - PROGRESS Partial Approval (02036) Canned lighting system in North amenities area. Ok to cover ceiling.
03/03/2020 BUILDING - PROGRESS Partial Approval Information only.
03/02/2020 BUILDING - PROGRESS Partial Approval Information for electric inspection scheduling.
02/28/2020 BUILDING - PROGRESS Not ready for Inspection Will reschedule for 2 March.
02/27/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
02/26/2020 BUILDING - PROGRESS Partial Approval Information only; set inspection schedule for room inspections.
02/25/2020 BUILDING - PROGRESS Partial Approval Information concerning the location of exit lighting in basement maintenance rooms and lobby area.
02/21/2020 BUILDING - PROGRESS Cancelled Canceled by contractor
02/20/2020 BUILDING - PROGRESS Partial Approval (01044); Room #102E, trash chute, Fire caulked. (01036); grid ceiling system in Rooms: D and G. Ok to set ceiling tiles.
02/19/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
02/18/2020 BUILDING - PROGRESS Partial Approval Information only. Need electric panel information for TEP.
02/14/2020 BUILDING - PROGRESS Cancelled Canceled by contractor
02/13/2020 BUILDING - PROGRESS Partial Approval 01045- Level #1; Section B Corridor; Rooms: 104; 106. Ok to tape progress areas.
02/12/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
02/11/2020 BUILDING - PROGRESS Not ready for Inspection (01045); will reschedule for 12 February.
02/07/2020 BUILDING - PROGRESS Not ready for Inspection no inspections ready at this time.
02/06/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
02/05/2020 BUILDING - PROGRESS Partial Approval Information only. Recommended fire safety construction for trash chutes on Levels 1 - 6.
02/04/2020 BUILDING - PROGRESS Partial Approval (01045); Level #6; Corridor B; Rooms: 605; 606; 608. Ok to tape progress areas
02/03/2020 BUILDING - PROGRESS Partial Approval Set electric schedule
01/31/2020 BUILDING - PROGRESS Partial Approval Information only; set electric meter inspection schedule.
01/30/2020 BUILDING - PROGRESS Partial Approval Electric intermediate: clearance to energize meter #LS1G and meter #Fire Pump. Information called in to Martin Rodriguez.
01/29/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
01/28/2020 BUILDING - PROGRESS Partial Approval Information only: reconfiguration of trash chute.
01/27/2020 BUILDING - PROGRESS Partial Approval (01045): Level #6; Section A, corridor walls and ceilings, (from Rooms 612-619). Ok to tape progress areas. Level #6 Rooms; 601; 602; 604; 625. Ok to tape progress areas.
01/24/2020 BUILDING - PROGRESS Partial Approval (02035); SES electric system at Level #1: Buss ducts, switch boards, disconnects. Panel #1L1A. Ok to energize SES System.

Clearance: Code: ECO
01/23/2020 BUILDING - PROGRESS Partial Approval Sheetrock nailing on Levels #4 & 5 (corridors and ceilings); Level #6; Rooms 611; 613; 614; 615; 616; 617; 619. Ok to tape progress areas.
01/17/2020 BUILDING - PROGRESS Not ready for Inspection will reschedule for 14 January.
01/16/2020 BUILDING - PROGRESS Not ready for Inspection
01/15/2020 BUILDING - PROGRESS Partial Approval Information only. Electric tie-in, grounding for panels and SES.
01/14/2020 BUILDING - PROGRESS Partial Approval Level #4; Section B, fire caulking in and around mechanical unit areas in rooms.
01/13/2020 BUILDING - PROGRESS Partial Approval Mechanical above ceiling; Level #4; Section A; HVAC units in rooms. Ok to cover.
01/10/2020 BUILDING - PROGRESS Partial Approval 02036; South and Southeast canopy area; canned lighting in place. Ok to cover progress areas.
01/09/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
01/08/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled. Schedule rooms for 9 January.
01/07/2020 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled; rescheduled for 8 January
01/06/2020 BUILDING - PROGRESS Partial Approval Information only; determined proposed electric cabinet and panel inspection schedule.
01/03/2020 BUILDING - PROGRESS Partial Approval
01/02/2020 BUILDING - PROGRESS Not ready for Inspection (01045). Will reschedule for 3 January
12/31/2019 BUILDING - PROGRESS Partial Approval (01045). Level #5; Rooms 501; 502; 504; 505; 506; 511; 512; 513. Ok to tape progress areas.
12/20/2019 BUILDING - PROGRESS Not ready for Inspection Soffit placement not ready
12/19/2019 BUILDING - PROGRESS Partial Approval Framing; Truss space bearing for ATS base plates as per RFI #307, dated 12-12-19. Level #4 ATS locations in corridors and rooms.
12/18/2019 BUILDING - PROGRESS Partial Approval Electrical information for kitchen island outlet placement.
12/17/2019 BUILDING - PROGRESS Partial Approval 01045; Level #5; Rooms 514; 515; 516; 517; 518. Ok to tape progress areas.
12/16/2019 BUILDING - PROGRESS Not ready for Inspection (01045), reschedule for 17 December
12/13/2019 BUILDING - PROGRESS Partial Approval Level #6; Room 603 Mechanical, Electrical, Plumbing intermediates. Ok to insulate and cover walls.
12/12/2019 BUILDING - PROGRESS Partial Approval (01035). Bearing truss space for ATS base plates; RFI #307 dated 12-12-19. Levels #3 and #5 corrections completed.
12/11/2019 BUILDING - PROGRESS Partial Approval (01045). Level #2: Mechanical Ceilings in rooms: 212; 214; 215; 216; 218; 219. Ok to tape progress areas. Level #4; Rooms: 401; 407; 408; 409; 410. Ok to tape progress areas.
12/10/2019 BUILDING - PROGRESS Partial Approval Electric, Plumbing, Mechanical above ceiling corridors A & B on level #6. Ok to cover ceilings.
12/09/2019 BUILDING - PROGRESS Partial Approval (01045). Level #3; Room 301; Corridor A - double layer. Level #4; Room 406. Ok to tape progress areas.
12/06/2019 BUILDING - PROGRESS Partial Approval Proposed new wiring system for room mechanical units.
12/05/2019 BUILDING - PROGRESS Partial Approval (01045). Level #4; Rooms: 404; 405; 413; 418. Ok to tape progress areas.
12/04/2019 BUILDING - PROGRESS Partial Approval (01045). Level #3; Corridor B. Level #4; Rooms : 402; 411; 411; 412; 414. Ok to tape progress areas.
12/02/2019 BUILDING - PROGRESS Partial Approval Electric intermediate, electric service and devices inspected (courtesy inspection) by Dan Santa Cruz.
11/29/2019 BUILDING - PROGRESS Cancelled Gates locked.
11/27/2019 BUILDING - PROGRESS Partial Approval Level #6; Sections A & B: all apartments except for #604; Electric intermediate and above ceiling; mechanical intermediate and above ceiling. Ok to insulate and Sheetrock progress areas.
11/26/2019 BUILDING - PROGRESS Not ready for Inspection Will reschedule for 27 November
11/25/2019 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
11/22/2019 BUILDING - PROGRESS Partial Approval (01045). Level #3; Rooms: 307; 308; 310. Ok to tape progress areas.
11/21/2019 BUILDING - PROGRESS Partial Approval
11/20/2019 BUILDING - PROGRESS Partial Approval
11/19/2019 BUILDING - PROGRESS Not ready for Inspection Rained out. Reschedule for 20 November
11/18/2019 BUILDING - PROGRESS Not ready for Inspection Will reschedule for 19 November.
11/15/2019 BUILDING - PROGRESS Partial Approval
11/14/2019 BUILDING - PROGRESS Partial Approval
11/13/2019 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled. Will reschedule for 14 November
11/08/2019 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
11/07/2019 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
11/06/2019 BUILDING - PROGRESS Partial Approval Exterior sheathing on North portion of building.
11/04/2019 BUILDING - PROGRESS Partial Approval
11/01/2019 BUILDING - PROGRESS Partial Approval Level #2; Rooms 203, 204; OK to tape progress areas.
10/31/2019 BUILDING - PROGRESS Partial Approval
10/30/2019 BUILDING - PROGRESS Partial Approval
10/29/2019 BUILDING - PROGRESS Partial Approval Information only.
10/28/2019 BUILDING - PROGRESS Partial Approval Penthouse exterior sheathing, ok to roof penthouse.
10/25/2019 BUILDING - PROGRESS Partial Approval Drywall 2nd layer rooms 214, 217.
10/24/2019 BUILDING - PROGRESS Not ready for Inspection Nothing ready.
10/23/2019 BUILDING - PROGRESS Partial Approval (01035); shear walls in units #212 and 218. Ok to cover walls.
10/18/2019 BUILDING - PROGRESS Partial Approval (01025). Roof level parapet walls; mid courtyard to Northwest area. Ok to waterproof progress areas.
10/17/2019 BUILDING - PROGRESS Partial Approval
10/16/2019 BUILDING - PROGRESS Partial Approval
10/15/2019 BUILDING - PROGRESS Partial Approval Information only.
10/14/2019 BUILDING - PROGRESS Partial Approval Information only.
10/11/2019 BUILDING - PROGRESS Not ready for Inspection Level #6 parapet walls. Contractor cancelled.
10/10/2019 BUILDING - PROGRESS Partial Approval South exterior walls at level #6 and parapet walls. Ok to waterproof progress areas
10/09/2019 BUILDING - PROGRESS Partial Approval Mechanical, Electrical, Plumbing on Level #5; Section B: rooms and corridors. Ok to insulate and cover walls.
10/08/2019 BUILDING - PROGRESS Partial Approval Mechanical, Electrical and Plumbing above ceiling in rooms and corridors in Section A, Level #5,
10/04/2019 BUILDING - PROGRESS Not ready for Inspection Level #5; Sections A & B (MEP’s); will reschedule for 8 October.
10/03/2019 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled.
10/02/2019 BUILDING - PROGRESS Partial Approval (Roof Nailing). Level #6; Section A, Roof deck and parapet walls. Ok to set roof drains and crickets.
10/01/2019 BUILDING - PROGRESS Partial Approval Level #5; Rooms in Sections A & B.
09/30/2019 BUILDING - PROGRESS Not ready for Inspection Contractor cancelled, no inspections for today.
09/27/2019 BUILDING - PROGRESS Partial Approval Level #5; Section B, ATS hold downs in place.
09/26/2019 BUILDING - PROGRESS Partial Approval Above ceilings in Level #4 corridors of Section A & B. Ok to
cover progress areas.
09/25/2019 BUILDING - PROGRESS Cancelled Inspection done on 9/24/19 by Jim
09/24/2019 BUILDING - PROGRESS Partial Approval Mechanical, Electrical, Plumbing above ceiling on Level #4; sections A & B. Ok to cover when all areas dry out from rain.
09/23/2019 BUILDING - PROGRESS Partial Approval South exterior walls and court yard exterior walls all at Levels #4 & 5. Ok to waterproof progress areas.
04/11/2019 BUILDING - PROGRESS Partial Approval Prototype 2 hour rated wall for stairwells and elevator shafts. Ok to continue use
03/19/2019 BUILDING - PROGRESS Not ready for Inspection No inspections for today as per contractor
03/08/2019 BUILDING - PROGRESS Partial Approval Post Tension Cabling system information