Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T17CM04810
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/09/2018 | REINFORCED MASONRY PRE-GROUT | Approved | ||
01/25/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | bldg top out ok | |
01/22/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | -NORTHWALL 3RD LIFT, EASTWALL TOPOUT, WESTSIDE THROUGH THE FIRST SERVICE BAY DOOR. | |
01/22/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 3rd lift north wall and storefront | |
01/19/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | PARTIAL APPROVED - 6TH LIFT SOUTH SIDE, AND 1ST LIFT NORTHWALL ABOVE STOREFRONT | |
01/18/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | EASTWALL 6TH LIFT OK, WESTWALL SERVICE BAY AND TIRE STORAGE 4TH LIFT | |
01/16/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1- east wall south of office 4th lift ok 2- south wall 4th lift ok 3- west columns 3rd lift ok |
|
01/16/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 20'-8" EAST WALL TOP OUT NORTH SHORT WALL |
|
01/12/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | south wall 3rd lift west columns 2nd lift north service bay 2nd lift |
|
01/11/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | cancelled | |
01/10/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1st lift showroom north wall and office 2nd lift south storage area ok |
|
01/08/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | PARTIAL | |
01/05/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1st lift dead tire storage and columns at front 2nd lift grid line A | |
12/22/2017 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | no work | |
12/20/2017 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 4 colums on west side 4' lift retaining wall app 60' south end | |
12/19/2017 | REINFORCED MASONRY PRE-GROUT | Partial Approval | stemwall bond beam ok | |
12/05/2017 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | no work |