Inspection Status: Approved
Inspection History: ELECTRIC - TEMPORARY POLE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/30/2017 |
ELECTRIC - TEMPORARY POLE |
|
Approved |
|
| 10/24/2017 |
ELECTRIC - TEMPORARY POLE |
|
Partial Approval |
THIS PERMIT IS FOR BOTH THE CONSTRUCTION TRAILER POWER, AND THE SITE TEMP POWER. CONDUITS FROM TRANSFORMER TO CT OK TO COVER. RE-CALL WHEN WIRING IS INSTALLED FROM CT TO DISCONNECTS. (LOCATED AT THE SOUTHEAST CORNER OF THE SITE) |
| 07/28/2017 |
ELECTRIC - TEMPORARY POLE |
|
Partial Approval |
|