Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T17CM02636
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2022 | ELECTRIC - FINAL | Approved | ||
| 04/03/2019 | ELECTRIC - FINAL | Approved | ||
| 04/03/2019 | ELECTRIC - FINAL | Partial Approval | ||
| 04/02/2019 | ELECTRIC - FINAL | Not ready for Inspection | work not complete | |
| 01/23/2019 | ELECTRIC - FINAL | Partial Approval | Corridor F0400, mech. Equipment room P0600 Pending coronation report and air balance report to Bob Sherry |
|
| 01/10/2019 | ELECTRIC - FINAL | Partial Approval | Transformers and panels area C OK to energize for test area B a panel L-J 5.8 UPS OK to energize for test all panels to remain locked out and tagged out |
|
| 12/20/2018 | ELECTRIC - FINAL | Partial Approval | Interior of Range chamber only | |
| 11/07/2018 | ELECTRIC - FINAL | Partial Approval | IT closet P0510 pending balance report | |
| 11/06/2018 | ELECTRIC - FINAL | Partial Approval | Elecrical room P0300 and UT room classified IT closet P0520 | |
| 10/29/2018 | ELECTRIC - FINAL | Partial Approval | Areas a, f and g pending chlorination report and air balance report to Bob Sherry pending engineering finals okay to apply for temporary C of o |
|
| 10/24/2018 | ELECTRIC - FINAL | Partial Approval | Inspection to areas A,G & F only Fuse water heater disconnects Complete difuser machine shop Complete insulation all pipes environmental room and throughout Pending chlorination report an air balance report to Bob Sherry between 8 and 9:30 a.m. in office Pending fire and Engineering finals |
|
| 10/19/2018 | ELECTRIC - FINAL | Partial Approval | Area "F" ok | |
| 10/18/2018 | ELECTRIC - FINAL | Not ready for Inspection |