Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/28/2019 | ELECTRIC - UNDERGROUND | Approved | ||
10/24/2018 | ELECTRIC - UNDERGROUND | Partial Approval | AFTER HOURS APA ACCOUNT $165.00 A equipment yard G0900 pad per detail 107/s3.3 |
|
07/31/2018 | ELECTRIC - UNDERGROUND | Partial Approval | MECH ROOM GL P FROM 6-7.2 ROOM C0701 AREA A |
|
07/24/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 1 X 3/4", 1 X 1" & 1 X 2" GL J5 | |
07/12/2018 | ELECTRIC - UNDERGROUND | Partial Approval | center section to be on revised plans, conduit ok | |
06/28/2018 | ELECTRIC - UNDERGROUND | Partial Approval | IVRS - Inspection :* 1 X 1 1/2" 1 X 1" 1 X 3/4" FLOR BOX AT COLUMN C-8 |
|
06/06/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 1 X 3/4" GOLF CART CHARGER EAST OF ATF 1 X 1" CAR CHARGER EAST OF ATF |
|
03/26/2018 | ELECTRIC - UNDERGROUND | Partial Approval | APPROX 200' OF 2-1" EAST HALF OF SOUTH SIDE ATM | |
03/12/2018 | ELECTRIC - UNDERGROUND | Partial Approval | exterior grounding grid line q 9-4 ok | |
02/27/2018 | ELECTRIC - UNDERGROUND | Not ready for Inspection | ||
02/21/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 1-21/" and grounding vault b ok 3-1' 1-21/2" and grounding at vault a ok | |
01/22/2018 | ELECTRIC - UNDERGROUND | Partial Approval | GROUNDING AT MECH YARD AND FIRE PUMP AT 2 ATF"S AND FIRE PUMP | |
01/17/2018 | ELECTRIC - UNDERGROUND | Not ready for Inspection | CANCELED | |
01/12/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 3/4" CONDUIT EXT. GFCI OUTLETS AT MECH YARD AND FIRE PUMPO YARD 6X1" CONDUIT FROM ELEC ROOM TO FIRE RISER ROOM |
|
01/04/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 2-2 1/2" CONDUIT INTO FIRE PUMP HOUSE 2- 1 1/2" CONDUIT AND 1- 3/4" CONDUIT FROM HP 3.1 ATO MECH ROOM 1-2" CONDUIT TO PANEL IN MECH ROOM NW CONTINUSTION OF 2-4" AND 1-2 1/2" CONDUIT TO PANELS ON GRID LINE J |
|
01/02/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 4 EACH 2 1/2" CONDUIT FROM DATA ROOM BUS DUCT TO ELECTRICAL ROOM 2 EACH 2 1/2" CONDUIT FROM TRANSFORMERTO FIRE PUMP 3 CONDUIT 1 EACH 4" AND 2 EACH 2 1/2" FROM MECHANICAL ROOM TO ELECTRICAL ROOM ALL UNDERGROUND CONDUIT FROM ELECTRICAL ROOM P0300 TO SWITCH GEAR ONLY |
|
12/27/2017 | ELECTRIC - UNDERGROUND | Partial Approval | 3-0 ground from swithc gears to transformers. grounding through electric room. underground- 9-4" conduits on a&b, 8-4", 1-2 1/2',1-1 1/2" CONDUITS COLUMN P to electric room, 6-1" from P8 toL8 | |
12/20/2017 | ELECTRIC - UNDERGROUND | Partial Approval | 8 EACH 4" CONDUIT, 1 EACH 2 1/2" AND 1 EACH 1 1/2" CONDUIT GRID LINE 4 FROM K TO P 2 EACH 4" AND 1 EACH 2 1/2" CONDUIT FEEDING PASNELS FROM GRID LINES J-6 TO P-5 ONLY WITH 2 EACH 4' AND 2 1/2" CONDUIT TO M-5 PANEL S |
|
12/18/2017 | ELECTRIC - UNDERGROUND | Not ready for Inspection | CANCELED BY JOEL | |
12/14/2017 | ELECTRIC - UNDERGROUND | Partial Approval | 4 EACH 4" CONDUIT AND 1 EACH 1 1/2" FOR TEMP POWER GRID LINE 4 FROM F TO K ONLY ELECTRICAL ROOM FROM DISTRIBUTION TO PDV 4 EACH 4" CONDUIT |
|
12/13/2017 | ELECTRIC - UNDERGROUND | Partial Approval | 4 EACH 4" AND 1 EACH 2 1/2" CONDUIT SOUTH OF COLUMN 4 FROM GRID LINE F TO K ONLY | |
12/08/2017 | ELECTRIC - UNDERGROUND | Partial Approval | 5" CONDUIT RISERS UNDER UTILITY VAULT A AND B SW CORNER TEST FACILITY | |
10/30/2017 | ELECTRIC - UNDERGROUND | Partial Approval | 4 FLOOR BOXES AT RM C0600 CONFERENCE ROOM ONLY | |
10/12/2017 | ELECTRIC - UNDERGROUND | Partial Approval | ALL UNDERGROUND GRID LINE F EAST FROM 2 - 8 ONLY | |
10/03/2017 | ELECTRIC - UNDERGROUND | Partial Approval | 4 EACH 4" CONDUIT GRID LINE E FROM 4 TO 5.5 CONTINUING TO GRID LINE 4 FROM E TO F ONLY | |
08/07/2017 | ELECTRIC - UNDERGROUND | Partial Approval | BOND WIRE FOR BUILDING A FOOTERS C-8, B-9, 4-C AND C-21 20' BOND AT A-P FOOTER |
|
08/04/2017 | ELECTRIC - UNDERGROUND | Partial Approval | TAILS ONLY FOR BUILDING GROOUNDING # OTT SEE HIGHLIGHTED AREAS ON E-9.0 |