Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T17CM02634

Parcel: 14043013B


Addresses:

1151 E HERMANS RD


Inspection Status: Approved

Inspection History: ELECTRIC - UNDERGROUND

Permit Number - T17CM02634

Inspection Description - ELECTRIC - UNDERGROUND

Inspection Status - Approved

Date Description Inspector Results Comments
03/27/2019 ELECTRIC - UNDERGROUND Approved
04/19/2018 ELECTRIC - UNDERGROUND Partial Approval APPROX 320' OF 2-1" CONDUITS FEEDIING LIGHT POLES ON W SIDE ATF
04/18/2018 ELECTRIC - UNDERGROUND Partial Approval APPROX 500' OF 1" BETWEEN LIGHT POLES ON ESAT SIDE ATF
04/17/2018 ELECTRIC - UNDERGROUND Partial Approval LIGHT POLE BSES COMPLETE ON SITE
04/10/2018 ELECTRIC - UNDERGROUND Partial Approval 2 SETS OF 26-4" FROM ATS VAULTS HEADING NORTH APPROX 100"
04/04/2018 ELECTRIC - UNDERGROUND Partial Approval STUB UP AT 2 SWITCH GEARS AND 2 TRANSFORMERS WEST SIDE ATF
04/02/2018 ELECTRIC - UNDERGROUND Partial Approval STUB UP AT CONTROL BLD IN ELECTRIC FIELD
03/29/2018 ELECTRIC - UNDERGROUND Cancelled
03/28/2018 ELECTRIC - UNDERGROUND Not ready for Inspection
03/23/2018 ELECTRIC - UNDERGROUND Not ready for Inspection
03/22/2018 ELECTRIC - UNDERGROUND Partial Approval 4-1" FROM WAST SIDE MPB TO LIGHT POLE
03/21/2018 ELECTRIC - UNDERGROUND Partial Approval STUB UPS AT CUP 20-4",10-4",24-3", 8-2" &3-11/2"
03/19/2018 ELECTRIC - UNDERGROUND Partial Approval 12-4" conduits tie in to mo6 vault 10- 4' CONDUITS CONTINUATION OF CLASSIFIED TO PARKING LOT AT MO6 VAULT
03/16/2018 ELECTRIC - UNDERGROUND Partial Approval app 85' of 22-4" conduits continuation to mo6 vault
03/14/2018 ELECTRIC - UNDERGROUND Partial Approval approx 90' of 22-4" at com bank to mo6, 32-3",6-11/2", 18-2" 1-4" at cup ok to cover
03/12/2018 ELECTRIC - UNDERGROUND Partial Approval app 30' of 10-2" for pv at east side mpb approx 160' 2-3/4" from mpb to pump on east side
03/09/2018 ELECTRIC - UNDERGROUND Partial Approval approx 140' 10-4" com conduits from road crossing heading south @atf 18-4" complete from 918 vault to vaults west side atf
03/08/2018 ELECTRIC - UNDERGROUND Partial Approval
03/07/2018 ELECTRIC - UNDERGROUND Partial Approval 4 light pole footings and grounding at nw mpb
03/06/2018 ELECTRIC - UNDERGROUND Partial Approval tie in to mpb com vaults ok to cover
03/05/2018 ELECTRIC - UNDERGROUND Partial Approval 4 light pole footings and grounding north side mpb, 1" conduit feeding same poles far east parking lot light pole foooting and grounding, 40' 18-4" com conduit continuation east from vault 918
03/02/2018 ELECTRIC - UNDERGROUND Partial Approval 32-4" from 918 cim vault app 50' to south 5 light pole footings and grounding east side mpb 1" conduit at east mpb road crossing app 60" 1" conduit between east 2 light poles north side mpb
03/01/2018 ELECTRIC - UNDERGROUND Partial Approval approx 60' pf 18- 4" conduits west side atf vaults heading east
02/28/2018 ELECTRIC - UNDERGROUND Partial Approval 90' 10-4" comm conduits at mpb road crossing, 2 sets of 4-5" 60' &120 from medium voltage vaults to services south side mpb, 300' 1" between light poles east side mpb
02/27/2018 ELECTRIC - UNDERGROUND Not ready for Inspection
02/23/2018 ELECTRIC - UNDERGROUND Partial Approval 20' of 4-2" 480 conduits to life safety vault atf 4-5" conduit to medium voltage vault
02/14/2018 ELECTRIC - UNDERGROUND Partial Approval 2- 4' secondary lines from transformer to service. approx 120' 3/4" between 2 north site light poles
02/09/2018 ELECTRIC - UNDERGROUND Not ready for Inspection
02/08/2018 ELECTRIC - UNDERGROUND Partial Approval 8-5",8-4" 10-2" conduits from MBE duct bank to medium voltage and life safety vaults
02/07/2018 ELECTRIC - UNDERGROUND Partial Approval 2-4" approx 80' to vault se corner mpb
02/06/2018 ELECTRIC - UNDERGROUND Partial Approval 2-4" conduits approx 320' east side mpb
02/05/2018 ELECTRIC - UNDERGROUND Cancelled
01/25/2018 ELECTRIC - UNDERGROUND Partial Approval 20- 5" conduits tie in at duct bank at TEP vaults north of K12
01/22/2018 ELECTRIC - UNDERGROUND Not ready for Inspection CANCELED
01/18/2018 ELECTRIC - UNDERGROUND Partial Approval 8X5", 6X2", 2X4", 4X2" AND 1X3"DUCT BANK EAST OF VAULTS WEST OF ATF TO SWITCHGEAR MPB DUCT BANK
01/11/2018 ELECTRIC - UNDERGROUND Partial Approval CUP FUTURE EQUIPMENT 8X5" CONDUIT, 4X4" CONDUIT AND 8X2" CONDUIT
4X5" CONDUIT FROM ELECTRICAL VAULTS TO ATF BUILDING GROM VAULT TO VAULT1500 KV WEST OF ATF
01/08/2018 ELECTRIC - UNDERGROUND Partial Approval 20-5" CONDUIT NORTH OF TEST FACILITIES DUCT BANK
01/03/2018 ELECTRIC - UNDERGROUND Partial Approval 20-5" CONDUIT DUCT BANK NORTH OF TEST FACILITY 100'
12/28/2017 ELECTRIC - UNDERGROUND Partial Approval 20-5" conduit approx 60' at tep
12/27/2017 ELECTRIC - UNDERGROUND Partial Approval 20-5" = 50' along road west
12/27/2017 ELECTRIC - UNDERGROUND Partial Approval 20-5" conduits appox 20' at t&p duct bank, 10-5" conduits @ ses vaults, 2-5" conduits approx 60' at location 917
12/26/2017 ELECTRIC - UNDERGROUND Partial Approval 20-5" PVC conduit approx 40' west along road ok to slurry
12/18/2017 ELECTRIC - UNDERGROUND Not ready for Inspection CANCELED
12/15/2017 ELECTRIC - UNDERGROUND Partial Approval 2EACH 4" CONDUIT NORTH OF K-12 FENCE THRU VAUOLT TO VISITOR CENTER ONLY
16 EACH 5" CONDUIT SOUTH OF ROAD 60' AFTER BEND
4 EACH 5" CONDUIT SAME AREA 60' FOR FUTURE TO RAYTHEON
12/13/2017 ELECTRIC - UNDERGROUND Not ready for Inspection NO WORK
12/06/2017 ELECTRIC - UNDERGROUND Partial Approval 16 PIECES 5" CONDUIT DUCT BANK TIE INTO TEP VAULT SOUTH EACH WAY
11/21/2017 ELECTRIC - UNDERGROUND Partial Approval 30' OF 5" CONDUIT 10 PIECES DUCT BANK EAST OF 917
11/20/2017 ELECTRIC - UNDERGROUND Partial Approval 80' DUCT BANK 10 PIECES 5" NORTH OF 917 ONLY
11/16/2017 ELECTRIC - UNDERGROUND Partial Approval 16 PIECES 5" CONDUIT DUCT BANK APPROX. 20' FROM SOUTH TEP VAULT ONLY
11/15/2017 ELECTRIC - UNDERGROUND Partial Approval 10 EACH 5' CONDUIT AT DUCT BANK TIED INTO 919A VAULT EAST SIDE
10 EACH 5' CONDUIT DUCT BANK TIED INTO 919 B VAULTEAST SIDE
11/14/2017 ELECTRIC - UNDERGROUND Partial Approval 20'- 16 PIECES 5" CONDUIT NORTH OF 11/16 INSPECTRION BY TEMP FENCE
11/13/2017 ELECTRIC - UNDERGROUND Partial Approval DUCT BANK 16 PIECES 5" CONDUIT APPROX. 60' SOUTH OF LAST INSPECTION
22 EACH POLE LIGHT BASES EAST END OF MULTI PURPOSE BUILDING PARKING LOT ONLY SEE RFI FOR ADDITION OF VERTICAL STEEL
11/06/2017 ELECTRIC - UNDERGROUND Partial Approval 140' OF 5" CONDUIT 16 PIECES EAST OF MULTI PURPOSE BUILDING PARKING LOT PENDING RFI
10/26/2017 ELECTRIC - UNDERGROUND Partial Approval 4 EACH 5" CONDUIT NORTH OF 9/17
10 EACH 5" CONDUIT RUNNING EAST DIRECTION 1 SECTION ONLY
10/19/2017 ELECTRIC - UNDERGROUND Partial Approval 20 EACH 5" CONDUIT TIED INTO VAULTS SE/SA AND 20 EACH INTO SE/SB
7- 5" CONDUIT TIE BREAKER OK TO COVER AND POUR
10/17/2017 ELECTRIC - UNDERGROUND Partial Approval multi purpose parking, lot lights and future solar UG conduit ok
10/10/2017 ELECTRIC - UNDERGROUND Partial Approval 20 EACH 5" CONDUIT FROM APPROX. GRID LINE N 80 WEST ONLY
10/09/2017 ELECTRIC - UNDERGROUND Partial Approval BEFORE HOURS APA ACCOUNT $165.00
8 EACH 4" CONDUIT
10 EACH 2" CONDUIT
8 EACH 5" CONDUIT
ALL AT ROAD CROSSING ONLY
CUP WEST DUCT BANK EAST AND WEST 5" CONDUIT 18 EACH ONLY
09/29/2017 ELECTRIC - UNDERGROUND Partial Approval 8EACH 5" CONDUIT FROM NORTH VAULT TO BEND OK TO ENCASE ONLY
09/26/2017 ELECTRIC - UNDERGROUND Partial Approval 18-6" conduit approx 50' from street south 80' ok to encase
08/10/2017 ELECTRIC - UNDERGROUND Not ready for Inspection CANCELED