Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2017 | FIRE - ALARM FINAL | Approved | ||
| 02/25/2017 | FIRE - ALARM FINAL | Partial Approval | Need to add one horn strobe to the midwest side of the building. Wire the fire sprinkler bell. | |
| 12/21/2016 | FIRE - ALARM FINAL | Partial Approval | Duct smoke detectors do not have good access. NFPA 72 2010 14.4.5.1 (need to provide access) Need to chech SW side back door area for proper coverage once the building is opened and fire alarm system is complete. Tested Water flow south 37 seconds Waterflow north 37 seconds Confirmed ground fault monitoring, notification devices, batteries, smoke detectors, heat detectors and tamper switch. Need to label riser room and inspectors test valve doors. Could not test the duct smoke detectors. Will allow for the fire watch to end but need communication as soon as possible regarding the duct smoke detectors. |
|
| 12/20/2016 | FIRE - ALARM FINAL | Denied | Fire alarm not monitored cannot test. | |
| 12/19/2016 | FIRE - ALARM FINAL | Denied | Fire alarm not monitored cannot test. | |
| 12/16/2016 | FIRE - ALARM FINAL | Denied | Fire alarm not monitored cannot test. |